Substituting spent copper slag as a replacement for sand as fill material in land reclamation projects
The lack of waste landfill used for waste disposal and the increasing cost of fill materials used for land reclamation projects in Singapore has led to the study on the suitability of using spent copper slag, a by-product of removing rust and marine deposit on ships, as the primary fill material for...
Saved in:
Main Author: | Ng, Xiang Hui. |
---|---|
Other Authors: | Tay Joo Hwa |
Format: | Final Year Project |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/48980 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Copper slag as construction material
by: Lai, Kwan Keong
Published: (2012) -
Stabilization of dredged clay slurry with carbide sludge (CS)-ground granulated blastfurnace slag (GGBS) for land reclamation
by: Li, Wentao
Published: (2022) -
Properties of copper slag concrete
by: Goh, Pei Ling.
Published: (2009) -
Properties of copper slag concrete
by: Zhang, Weide
Published: (2009) -
Engineered reclamation fill material created from excavated soft material and Granulated Blast Furnace Slag (GBFS)
by: Qian, Bingyun
Published: (2013)