Solving constrained workload scheduling problems
The major contribution of this thesis are 1) Improved generation of initial schedules using code reuse mechanism. 2) Comparison of cooling schedules in a large constrained problem. 3) Improved cooling schedules.
Saved in:
Main Author: | Ng, Mun Leong. |
---|---|
Other Authors: | Gooi, Hoay Beng |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/4958 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Solving combinatorial optimization problems by soft computing
by: Li, Sa.
Published: (2008) -
Android applications for solving complex number problems
by: Taherin,Ghazi Muhammad Neyamul
Published: (2020) -
Chaotic neural networks for solving combinatorial optimization problems
by: Tian, Fuyu.
Published: (2008) -
Parallel memetic algorithms for solving large scale combinatorial optimization problems
by: Tang, Jing
Published: (2008) -
Crew scheduling problem for mass rapid transit systems
by: Li, Yingying
Published: (2022)