Multi-hazard risk assessment
The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake,...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/49762 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-49762 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-497622023-03-03T17:05:32Z Multi-hazard risk assessment Tan, Jia Hui. Kusnowidjaja Megawati School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include: (1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed. (2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis. (3) Application of the developed method to the case study in West Sumatra, Indonesia. Bachelor of Engineering (Civil) 2012-05-24T02:32:39Z 2012-05-24T02:32:39Z 2012 2012 Final Year Project (FYP) http://hdl.handle.net/10356/49762 en Nanyang Technological University 52 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Civil engineering |
spellingShingle |
DRNTU::Engineering::Civil engineering Tan, Jia Hui. Multi-hazard risk assessment |
description |
The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include:
(1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed.
(2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis.
(3) Application of the developed method to the case study in West Sumatra, Indonesia. |
author2 |
Kusnowidjaja Megawati |
author_facet |
Kusnowidjaja Megawati Tan, Jia Hui. |
format |
Final Year Project |
author |
Tan, Jia Hui. |
author_sort |
Tan, Jia Hui. |
title |
Multi-hazard risk assessment |
title_short |
Multi-hazard risk assessment |
title_full |
Multi-hazard risk assessment |
title_fullStr |
Multi-hazard risk assessment |
title_full_unstemmed |
Multi-hazard risk assessment |
title_sort |
multi-hazard risk assessment |
publishDate |
2012 |
url |
http://hdl.handle.net/10356/49762 |
_version_ |
1759855755348934656 |