Multi-hazard risk assessment

The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake,...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Jia Hui.
Other Authors: Kusnowidjaja Megawati
Format: Final Year Project
Language:English
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/10356/49762
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-49762
record_format dspace
spelling sg-ntu-dr.10356-497622023-03-03T17:05:32Z Multi-hazard risk assessment Tan, Jia Hui. Kusnowidjaja Megawati School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include: (1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed. (2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis. (3) Application of the developed method to the case study in West Sumatra, Indonesia. Bachelor of Engineering (Civil) 2012-05-24T02:32:39Z 2012-05-24T02:32:39Z 2012 2012 Final Year Project (FYP) http://hdl.handle.net/10356/49762 en Nanyang Technological University 52 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering
spellingShingle DRNTU::Engineering::Civil engineering
Tan, Jia Hui.
Multi-hazard risk assessment
description The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include: (1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed. (2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis. (3) Application of the developed method to the case study in West Sumatra, Indonesia.
author2 Kusnowidjaja Megawati
author_facet Kusnowidjaja Megawati
Tan, Jia Hui.
format Final Year Project
author Tan, Jia Hui.
author_sort Tan, Jia Hui.
title Multi-hazard risk assessment
title_short Multi-hazard risk assessment
title_full Multi-hazard risk assessment
title_fullStr Multi-hazard risk assessment
title_full_unstemmed Multi-hazard risk assessment
title_sort multi-hazard risk assessment
publishDate 2012
url http://hdl.handle.net/10356/49762
_version_ 1759855755348934656