A construction productivity study on precast concrete installation
This report is part of an ongoing study under a research team which consists of one Ph.D student (Ali Najafi) and two final year students (Ting Weiwen Darren and the author). The aim of the study is to examine the factors affecting the installation of precast concrete components in a variety o...
Saved in:
Main Author: | Kaung Set, Zaw. |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/50275 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Construction productivity of precast concrete installation on site
by: Ting, Darren Weiwen.
Published: (2012) -
A BIM and construction productivity study on precast concrete installation
by: Sun, Jing Xiang
Published: (2015) -
A bim and construction productivity study on precast concrete installation
by: Cui, Yue
Published: (2014) -
Precast concrete construction for the building industry
by: Leow, Geok Mui.
Published: (2008) -
Modeling the productivity of precast concrete operations
by: Ali Najafi
Published: (2014)