Industrial attachment report on conversion of chemical odour system to biological odour system in Changi WRP
The author of the report had undergone 22 weeks of industrial attachment with Public Utilities Board, Changi Water Reclamation Plant (CWRP). She was assigned to convert chemical odour system to biological odour system using existing structure and media in CWRP. She must also assess the feasibility o...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | |
語言: | English |
出版: |
2013
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/51081 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|