Report on industrial attachment with Environmental Professionals

The author was attached to Environmental Professionals (ENVIRO PRO) for her industrial attachment from 5th February 2011 to 8th July 2011. The following report depicted the author’s training experiences during her attachment and provides a thorough insight of the knowledge and skills acquired. The m...

Full description

Saved in:
Bibliographic Details
Main Author: Loy, Yoong Shin.
Other Authors: Sun Delai, Darren
Format: Industrial Attachment (IA)
Language:English
Published: 2013
Subjects:
Online Access:http://hdl.handle.net/10356/51086
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:The author was attached to Environmental Professionals (ENVIRO PRO) for her industrial attachment from 5th February 2011 to 8th July 2011. The following report depicted the author’s training experiences during her attachment and provides a thorough insight of the knowledge and skills acquired. The main projects that the author participated in; Sembawang Vertical Greenwall Systems Project, Marina Reservoir Embankment Re-greeningResearch Project, Kranji Reservoir Biodiversity Impact Assessment Project, Pandan Reservoir Floating Wetland Project and Kallang River Restoration Project will be covered in detail. The author’s self reflections on lessons learnt were presented at the end of each account, together with difficulties faced with during the work progress.