Multi-criteria re-entrant jobs scheduling problems using GA and AHP
The re-entrant scheduling problem came into prominence as a new type of scheduling problem in the past years. It is found in many production systems, particularly in high-tech industries such as semiconductor wafer fabrication and repairing companies. The principle characteristic of a re-entrant sho...
Saved in:
Main Author: | Lin, Danping. |
---|---|
Other Authors: | Chen Chun-Hsien |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/51160 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Integrating analytical hierarchy process to genetic algorithm for re-entrant flow shop scheduling problem
by: Lee, C. K. M., et al.
Published: (2013) -
Prototype GA-enhanced multi-objective dynamic scheduler for multiple shop floors
by: Yin, Xiaofeng.
Published: (2008) -
An application of neural network for job shop scheduling
by: Tan, Tuan Heng.
Published: (2009) -
Biologically inspired algorithims for job shop scheduling optimization
by: Low, Malcolm Yoke Hean.
Published: (2010) -
Job scheduling of batch furnace processing in semiconductor wafer fab using simulation approach
by: Subramanian Harhara Subramanian.
Published: (2008)