Power management system design and optimization for European Student Moon Orbitor (ESMO)

In this project, the focus will be on the design and development of the power management system for a mini-satellite under the European Student Moon Orbitor (ESMO) program. ESMO is a European Space Agency (ESA) initiative to involve the universities to build the first student satellite to orbit the...

Full description

Saved in:
Bibliographic Details
Main Author: Muhammad Dzahir Mohamed Zain Affandi.
Other Authors: Low Kay Soon
Format: Final Year Project
Language:English
Published: 2013
Subjects:
Online Access:http://hdl.handle.net/10356/52176
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-52176
record_format dspace
spelling sg-ntu-dr.10356-521762023-07-07T16:57:04Z Power management system design and optimization for European Student Moon Orbitor (ESMO) Muhammad Dzahir Mohamed Zain Affandi. Low Kay Soon School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Power electronics DRNTU::Engineering::Electrical and electronic engineering::Electronic circuits DRNTU::Engineering::Electrical and electronic engineering::Integrated circuits DRNTU::Engineering::Electrical and electronic engineering::Satellite telecommunication In this project, the focus will be on the design and development of the power management system for a mini-satellite under the European Student Moon Orbitor (ESMO) program. ESMO is a European Space Agency (ESA) initiative to involve the universities to build the first student satellite to orbit the Moon. NTU satellite research centre is the only university outside EU to participate in this program. The main source of power for ESMO is the Gallium Arsenide solar array which converts solar energy from the Sun into usable electricity. The buck converter designed is to be able to step down from a voltage of 80V to a bus line of 28V with the use of a specially controlled high frequency switching MOSFET through a high speed 100 MHz microcontroller C8051. Since there is a high floating voltage of 80V at the load side, it is necessary to implement a bootstrap circuitry to provide the necessary voltage to turn on the respective switches. In addition, with the help of the protection circuit, the inrush current can be modulated to operate at a maximum of 2.5A and a duration of 32ms before an internal shutdown is initiated. Overall efficiency of the power system is intensively analysed so as to ensure power losses are to be kept minimum. A performance test was conducted to compare between the asynchronous and synchronous buck converter. Synchronous buck converter has an efficiency of 87.3% which is much higher than asynchronous design of just 84.1%. Output current and voltage ripple is measured at 6.81% and 3.625%. Due to the nonlinearity of IV curve of the solar panel, the power extracted by the solar panel may not be at the maximum that the solar panel can theoretically provide. As such, a maximum-power-point-tracking (MPPT) algorithm has been implemented to achieve this goal. Two algorithm techniques have been explored namely the Perturb & Observe (P&O) and the Incremental Conductance (IC) technique. Based on the experimental results, the tracking algorithm of IC reaches as high as 92.05% which is higher than the P&O algorithm of just 89.49%. Another significant advantage of the IC is the speed of response under sudden change of environment conditions at which it can achieve 0.32 seconds response time which is 4 times faster than P&O. This characteristic is very important especially in the harsh conditions in space. Bachelor of Engineering 2013-04-24T07:44:04Z 2013-04-24T07:44:04Z 2013 2013 Final Year Project (FYP) http://hdl.handle.net/10356/52176 en Nanyang Technological University 103 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Power electronics
DRNTU::Engineering::Electrical and electronic engineering::Electronic circuits
DRNTU::Engineering::Electrical and electronic engineering::Integrated circuits
DRNTU::Engineering::Electrical and electronic engineering::Satellite telecommunication
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Power electronics
DRNTU::Engineering::Electrical and electronic engineering::Electronic circuits
DRNTU::Engineering::Electrical and electronic engineering::Integrated circuits
DRNTU::Engineering::Electrical and electronic engineering::Satellite telecommunication
Muhammad Dzahir Mohamed Zain Affandi.
Power management system design and optimization for European Student Moon Orbitor (ESMO)
description In this project, the focus will be on the design and development of the power management system for a mini-satellite under the European Student Moon Orbitor (ESMO) program. ESMO is a European Space Agency (ESA) initiative to involve the universities to build the first student satellite to orbit the Moon. NTU satellite research centre is the only university outside EU to participate in this program. The main source of power for ESMO is the Gallium Arsenide solar array which converts solar energy from the Sun into usable electricity. The buck converter designed is to be able to step down from a voltage of 80V to a bus line of 28V with the use of a specially controlled high frequency switching MOSFET through a high speed 100 MHz microcontroller C8051. Since there is a high floating voltage of 80V at the load side, it is necessary to implement a bootstrap circuitry to provide the necessary voltage to turn on the respective switches. In addition, with the help of the protection circuit, the inrush current can be modulated to operate at a maximum of 2.5A and a duration of 32ms before an internal shutdown is initiated. Overall efficiency of the power system is intensively analysed so as to ensure power losses are to be kept minimum. A performance test was conducted to compare between the asynchronous and synchronous buck converter. Synchronous buck converter has an efficiency of 87.3% which is much higher than asynchronous design of just 84.1%. Output current and voltage ripple is measured at 6.81% and 3.625%. Due to the nonlinearity of IV curve of the solar panel, the power extracted by the solar panel may not be at the maximum that the solar panel can theoretically provide. As such, a maximum-power-point-tracking (MPPT) algorithm has been implemented to achieve this goal. Two algorithm techniques have been explored namely the Perturb & Observe (P&O) and the Incremental Conductance (IC) technique. Based on the experimental results, the tracking algorithm of IC reaches as high as 92.05% which is higher than the P&O algorithm of just 89.49%. Another significant advantage of the IC is the speed of response under sudden change of environment conditions at which it can achieve 0.32 seconds response time which is 4 times faster than P&O. This characteristic is very important especially in the harsh conditions in space.
author2 Low Kay Soon
author_facet Low Kay Soon
Muhammad Dzahir Mohamed Zain Affandi.
format Final Year Project
author Muhammad Dzahir Mohamed Zain Affandi.
author_sort Muhammad Dzahir Mohamed Zain Affandi.
title Power management system design and optimization for European Student Moon Orbitor (ESMO)
title_short Power management system design and optimization for European Student Moon Orbitor (ESMO)
title_full Power management system design and optimization for European Student Moon Orbitor (ESMO)
title_fullStr Power management system design and optimization for European Student Moon Orbitor (ESMO)
title_full_unstemmed Power management system design and optimization for European Student Moon Orbitor (ESMO)
title_sort power management system design and optimization for european student moon orbitor (esmo)
publishDate 2013
url http://hdl.handle.net/10356/52176
_version_ 1772828655564619776