Industrial attachment with Asian Surface Technologies Pte Ltd
This report will elaborate on the two projects that the author has done during the six months Industrial Attachment in AST: 1) Feasibility study on standard work and cellular manufacturing and 2) Optimization of diamond compound consumption for the lapping process. There will also be an account of t...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5242 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Summary: | This report will elaborate on the two projects that the author has done during the six months Industrial Attachment in AST: 1) Feasibility study on standard work and cellular manufacturing and 2) Optimization of diamond compound consumption for the lapping process. There will also be an account of the skills and experiences gained during these 24 weeks of attachment. |
---|