Mixed reality machine builder
A fast product launch and a rapid production start are decisive factors for productsuccess. To accomplish these requirements, production machines have to be built in the shortest time possible. In contrast to this, the validation of the real control system is delayed until the machine is with except...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5323 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-5323 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-53232023-03-11T17:41:48Z Mixed reality machine builder Vasudevan Rajesh Goh, Kiah Mok School of Mechanical and Aerospace Engineering DRNTU::Engineering::Mechanical engineering::Machine design and construction A fast product launch and a rapid production start are decisive factors for productsuccess. To accomplish these requirements, production machines have to be built in the shortest time possible. In contrast to this, the validation of the real control system is delayed until the machine is with exception for the control system almost ready for production. Master of Science (Computer Integrated Manufacturing) 2008-09-17T10:47:50Z 2008-09-17T10:47:50Z 2005 2005 Thesis http://hdl.handle.net/10356/5323 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Mechanical engineering::Machine design and construction |
spellingShingle |
DRNTU::Engineering::Mechanical engineering::Machine design and construction Vasudevan Rajesh Mixed reality machine builder |
description |
A fast product launch and a rapid production start are decisive factors for productsuccess. To accomplish these requirements, production machines have to be built in the shortest time possible. In contrast to this, the validation of the real control system is delayed until the machine is with exception for the control system almost ready for production. |
author2 |
Goh, Kiah Mok |
author_facet |
Goh, Kiah Mok Vasudevan Rajesh |
format |
Theses and Dissertations |
author |
Vasudevan Rajesh |
author_sort |
Vasudevan Rajesh |
title |
Mixed reality machine builder |
title_short |
Mixed reality machine builder |
title_full |
Mixed reality machine builder |
title_fullStr |
Mixed reality machine builder |
title_full_unstemmed |
Mixed reality machine builder |
title_sort |
mixed reality machine builder |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/5323 |
_version_ |
1761781855704580096 |