Modeling the productivity of precast concrete operations
Despite the extensive use of precast concrete (PC) elements in different construction projects such as high rise residential and commercial buildings, there is no study to provide details about the factors that affect productivity of PC erection (installation) process and model the productivity of t...
Saved in:
Main Author: | Ali Najafi |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/59232 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Integrated planning and scheduling for precast concrete production
by: Zhai, Xiaofeng
Published: (2008) -
The management of precast concrete production and usage in Singapore
by: Ong, Ting Guan.
Published: (2008) -
Construction productivity of precast concrete installation on site
by: Ting, Darren Weiwen.
Published: (2012) -
A construction productivity study on precast concrete installation
by: Kaung Set, Zaw.
Published: (2012) -
A BIM and construction productivity study on precast concrete installation
by: Sun, Jing Xiang
Published: (2015)