Risk assessment and modelling for underground cavern construction project
Many cost-time models available today are based on previous underground construction projects where the models originated from. This is unfavourable for Singapore as her geological conditions differ from these countries. As such, a cost-time model catered to Singapore’s geological condition was c...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | Final Year Project |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/60004 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |