Report on industrial attachment with YTL PowerSeraya Pte Limited
This report contains and presents the industrial attachment experience gained by the author in the 22-week industrial attachment at Pulau Seraya Power Station. Throughout this period, the author was attached to the Electrical Maintenance department under Utilities Group. The primary aim of the attac...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/60189 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |