Implement finite scheduling for downhole equipment product line using Adexa

Computer based scheduling systems have been becoming more and more popular in today’s manufacturing companies. These systems retrieve shop floor data from the Enterprise Resource Planning (ERP) systems and then create optimized finite capacity schedules, which reduce the manual scheduling effort sig...

Full description

Saved in:
Bibliographic Details
Main Author: Guo, Yuming
Other Authors: Lee Ka Man, Carman
Format: Theses and Dissertations
Language:English
Published: 2014
Subjects:
Online Access:http://hdl.handle.net/10356/60564
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-60564
record_format dspace
spelling sg-ntu-dr.10356-605642020-11-01T11:30:25Z Implement finite scheduling for downhole equipment product line using Adexa Guo, Yuming Lee Ka Man, Carman School of Mechanical and Aerospace Engineering Singapore-MIT Alliance Programme DRNTU::Engineering::Manufacturing Computer based scheduling systems have been becoming more and more popular in today’s manufacturing companies. These systems retrieve shop floor data from the Enterprise Resource Planning (ERP) systems and then create optimized finite capacity schedules, which reduce the manual scheduling effort significantly. Without such systems, the planners need to spend much more time to make the production schedules manually. In this thesis, the implementation of Adexa, which is a computer based scheduling system, was carried out in Schlumberger. This project focuses on the shop floor process modelling and data collection of the pump assembly process. The methodology of this project will be used as a framework to model the manufacturing process for other equipments and their components. ​Master of Science (IMST) 2014-05-28T07:07:14Z 2014-05-28T07:07:14Z 2009 2009 Thesis http://hdl.handle.net/10356/60564 en 47 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Manufacturing
spellingShingle DRNTU::Engineering::Manufacturing
Guo, Yuming
Implement finite scheduling for downhole equipment product line using Adexa
description Computer based scheduling systems have been becoming more and more popular in today’s manufacturing companies. These systems retrieve shop floor data from the Enterprise Resource Planning (ERP) systems and then create optimized finite capacity schedules, which reduce the manual scheduling effort significantly. Without such systems, the planners need to spend much more time to make the production schedules manually. In this thesis, the implementation of Adexa, which is a computer based scheduling system, was carried out in Schlumberger. This project focuses on the shop floor process modelling and data collection of the pump assembly process. The methodology of this project will be used as a framework to model the manufacturing process for other equipments and their components.
author2 Lee Ka Man, Carman
author_facet Lee Ka Man, Carman
Guo, Yuming
format Theses and Dissertations
author Guo, Yuming
author_sort Guo, Yuming
title Implement finite scheduling for downhole equipment product line using Adexa
title_short Implement finite scheduling for downhole equipment product line using Adexa
title_full Implement finite scheduling for downhole equipment product line using Adexa
title_fullStr Implement finite scheduling for downhole equipment product line using Adexa
title_full_unstemmed Implement finite scheduling for downhole equipment product line using Adexa
title_sort implement finite scheduling for downhole equipment product line using adexa
publishDate 2014
url http://hdl.handle.net/10356/60564
_version_ 1688665312959922176