The research analysis on the projection of the warehouse occupancy in a pharmaceutical company

Currently the warehouse occupancy in NPC is around 85%. As the new product C launches next year, the occupancy will increase as well. In order to forecast the utilization of the warehouse capacity before hand and to effectively manage the inventory of the new product, we present two methods to analy...

Full description

Saved in:
Bibliographic Details
Main Author: Zhao, Changhui
Other Authors: Shaligram Pokharel
Format: Theses and Dissertations
Language:English
Published: 2014
Subjects:
Online Access:http://hdl.handle.net/10356/60664
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-60664
record_format dspace
spelling sg-ntu-dr.10356-606642020-11-01T11:29:05Z The research analysis on the projection of the warehouse occupancy in a pharmaceutical company Zhao, Changhui Shaligram Pokharel School of Mechanical and Aerospace Engineering Singapore-MIT Alliance Programme DRNTU::Engineering::Manufacturing Currently the warehouse occupancy in NPC is around 85%. As the new product C launches next year, the occupancy will increase as well. In order to forecast the utilization of the warehouse capacity before hand and to effectively manage the inventory of the new product, we present two methods to analyze the safety stock level of Product C. We use the continuous review policy to estimate the safety stock level, the expected inventory level and reorder level for each type of raw materials. We applied the aggregate safety stock model to estimate the base stock level for finished goods. Through the application of these two methods, the warehouse capacity can be saved around 30% for Product C safety inventory. But we also found out that the current warehouse capacity will still not be sustainable enough when Product C is fully in production. Solutions to avoid warehouse over utilization need to be taken before Product C is fully launched. ​Master of Science (IMST) 2014-05-29T04:14:41Z 2014-05-29T04:14:41Z 2008 2008 Thesis http://hdl.handle.net/10356/60664 en 57 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Manufacturing
spellingShingle DRNTU::Engineering::Manufacturing
Zhao, Changhui
The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
description Currently the warehouse occupancy in NPC is around 85%. As the new product C launches next year, the occupancy will increase as well. In order to forecast the utilization of the warehouse capacity before hand and to effectively manage the inventory of the new product, we present two methods to analyze the safety stock level of Product C. We use the continuous review policy to estimate the safety stock level, the expected inventory level and reorder level for each type of raw materials. We applied the aggregate safety stock model to estimate the base stock level for finished goods. Through the application of these two methods, the warehouse capacity can be saved around 30% for Product C safety inventory. But we also found out that the current warehouse capacity will still not be sustainable enough when Product C is fully in production. Solutions to avoid warehouse over utilization need to be taken before Product C is fully launched.
author2 Shaligram Pokharel
author_facet Shaligram Pokharel
Zhao, Changhui
format Theses and Dissertations
author Zhao, Changhui
author_sort Zhao, Changhui
title The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
title_short The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
title_full The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
title_fullStr The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
title_full_unstemmed The research analysis on the projection of the warehouse occupancy in a pharmaceutical company
title_sort research analysis on the projection of the warehouse occupancy in a pharmaceutical company
publishDate 2014
url http://hdl.handle.net/10356/60664
_version_ 1686109403258814464