Simulation based analysis on ways to improve the factory performance
An effective production strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this project, the author treat the n-job, two-stage hybrid flow line problem with 2 different machines in the first station and 7 i...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | Theses and Dissertations |
語言: | English |
出版: |
2014
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/60667 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
語言: | English |