Simulation based analysis on ways to improve the factory performance
An effective production strategy would lead to efficient production line performance as well as increased profit. However, there is no fixed or generalized solution. In this project, the author treat the n-job, two-stage hybrid flow line problem with 2 different machines in the first station and 7 i...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/60667 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |