Forecasting model development for gauge production line of an oilfield service company
Without a short term forecasting system in the gauge production line, the planning is encountering problems in materials requirement planning. Also, a monthly forecasting system is a prerequisite for the production line to reduce the lead time to customer by implementing the Kanban system.
Saved in:
Main Author: | Lang, Xiaoling |
---|---|
Other Authors: | Lee Ka Man, Carman |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/60674 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Foundry production scheduling by Adexa in an oilfield service company
by: Wang, Xiaojun
Published: (2014) -
Study on planning logics and adexa system integration for an oilfield service company
by: Liu, Junying
Published: (2014) -
Process improvement on vibration test in gauge production line
by: Liu, Ren
Published: (2014) -
Design of a more effective vibration test method in gauge production
by: Li, Wu
Published: (2014) -
Integrated multi-gauging system
by: Lim, Dolly Kim Kee.
Published: (2008)