Finite capacity planning in a discrete manufacturing environment
The objective of this thesis was to find out reasons as to how the Materials Plan can work in conjunction with a detailed capacity plan, based on Finite Capacity requirements in manufacturing environment, which has many resources that can be operated parallely.
Saved in:
Main Author: | Mayura Belagod Ravichandra Gupta. |
---|---|
Other Authors: | Lam, Soi Hoi |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6153 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Resource planning with computer simulation in a semiconductor backend manufacturing environment
by: Liew, Kee Min.
Published: (2008) -
Parallel discrete event simulation for manufacturing systems
by: Low, Yoke Hean.
Published: (2010) -
Development of a knowledge-based manufacturing modelling system based on IDEF0 for the discrete manufacturing industry
by: Luo, Ming.
Published: (2011) -
Capacity planning and production scheduling at a syringe production facility
by: Liaw, Sze Sen
Published: (2014) -
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach
by: Zuo, Jie
Published: (2014)