Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach
In PCB Assembly manufacturing environment, there are usually three objectives to achieve – minimizing setup cost, minimizing average cycle time, and minimizing job lateness. With the re-entrant trait of PCB Assembly system, scheduling job release is a complicated but crucial problem which plays an i...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/61590 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-61590 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-615902020-11-01T11:38:33Z Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach Zuo, Jie Appa Iyer Sivakumar School of Mechanical and Aerospace Engineering Singapore-MIT Alliance Programme DRNTU::Engineering::Manufacturing In PCB Assembly manufacturing environment, there are usually three objectives to achieve – minimizing setup cost, minimizing average cycle time, and minimizing job lateness. With the re-entrant trait of PCB Assembly system, scheduling job release is a complicated but crucial problem which plays an important role in improving the whole factory performance, maximizing factory production capability, minimizing waste and maximizing revenue. How to schedule jobs with dynamic queue to achieve the three objectives is where we focus on. Master of Science (IMST) 2014-06-17T00:50:04Z 2014-06-17T00:50:04Z 2007 2007 Thesis http://hdl.handle.net/10356/61590 en 50 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Manufacturing |
spellingShingle |
DRNTU::Engineering::Manufacturing Zuo, Jie Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
description |
In PCB Assembly manufacturing environment, there are usually three objectives to achieve – minimizing setup cost, minimizing average cycle time, and minimizing job lateness. With the re-entrant trait of PCB Assembly system, scheduling job release is a complicated but crucial problem which plays an important role in improving the whole factory performance, maximizing factory production capability, minimizing waste and maximizing revenue. How to schedule jobs with dynamic queue to achieve the three objectives is where we focus on. |
author2 |
Appa Iyer Sivakumar |
author_facet |
Appa Iyer Sivakumar Zuo, Jie |
format |
Theses and Dissertations |
author |
Zuo, Jie |
author_sort |
Zuo, Jie |
title |
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
title_short |
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
title_full |
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
title_fullStr |
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
title_full_unstemmed |
Multi-objective scheduling in PCB assembly manufacturing : discrete event simulation approach |
title_sort |
multi-objective scheduling in pcb assembly manufacturing : discrete event simulation approach |
publishDate |
2014 |
url |
http://hdl.handle.net/10356/61590 |
_version_ |
1683494351084191744 |