Domain-based constraint satisfaction approach to production volume allocation in multi-site manufacturing supply chain
The production volume allocation problem has traditionally been associated distinctly with resource management, inventory management, task management, etc. The solution to this problem have been challenged by the combinatorial effects resulting from simultaneous handling of various factors related t...
Saved in:
Main Author: | Ng, Ngai Kheong. |
---|---|
Other Authors: | Jiao, Roger Jianxin |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6207 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Improving supply chain resilience at tetra pak using multi-stage supply chain
by: Hiu, Elsa Man Leung
Published: (2014) -
Concurrent engineering across a multi-location factory : managing the interface among engineering, design and manufacturing
by: Kothandaraman Anandharama.
Published: (2008) -
Multi-agent system-based supply chain coordination
by: Cheong, Lee Fong, et al.
Published: (2014) -
Manufacturing plant location decisions and Singapore as a manufacturing hub
by: Ravi Phadke
Published: (2008) -
Supply chain planning of global electronics manufacturer for short life cycle products
by: Saxena, Suruchi, et al.
Published: (2014)