Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development)
This dissertation concentrates on the critical machines first using forward, backward and ‘forward & backward’ scheduling techniques, which is a different approach from other scheduling systems commercially available. The “scheduling around bottleneck” approach aims to utilize the bottleneck mac...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | Theses and Dissertations |
出版: |
2008
|
主題: | |
在線閱讀: | http://hdl.handle.net/10356/6413 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Nanyang Technological University |
id |
sg-ntu-dr.10356-6413 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-64132023-03-11T16:57:12Z Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) Sundaramoorthy Ravikumar. Piplani, Rajesh School of Mechanical and Production Engineering DRNTU::Engineering::Manufacturing::Production management This dissertation concentrates on the critical machines first using forward, backward and ‘forward & backward’ scheduling techniques, which is a different approach from other scheduling systems commercially available. The “scheduling around bottleneck” approach aims to utilize the bottleneck machines to the maximum and leads to higher output. Master of Science 2008-09-17T11:14:23Z 2008-09-17T11:14:23Z 2002 2002 Thesis http://hdl.handle.net/10356/6413 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Manufacturing::Production management |
spellingShingle |
DRNTU::Engineering::Manufacturing::Production management Sundaramoorthy Ravikumar. Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
description |
This dissertation concentrates on the critical machines first using forward, backward and ‘forward & backward’ scheduling techniques, which is a different approach from other scheduling systems commercially available. The “scheduling around bottleneck” approach aims to utilize the bottleneck machines to the maximum and leads to higher output. |
author2 |
Piplani, Rajesh |
author_facet |
Piplani, Rajesh Sundaramoorthy Ravikumar. |
format |
Theses and Dissertations |
author |
Sundaramoorthy Ravikumar. |
author_sort |
Sundaramoorthy Ravikumar. |
title |
Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
title_short |
Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
title_full |
Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
title_fullStr |
Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
title_full_unstemmed |
Scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
title_sort |
scheduling around bottleneck resources : a scheduling approach for flexible flow lines (software system development) |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/6413 |
_version_ |
1761781998942158848 |