Scheduling manufacturing system with sequence dependent setup and maintenance
Few researches in scheduling literature have considered setup and maintenance concurrently. This thesis analyzes sequence-dependent setup scheduling problem with non-resumable case of maintenance consideration to minimize makespan (maximizing utilization) on a single machine. Some parts of machine t...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/64823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-64823 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-648232023-03-11T17:32:01Z Scheduling manufacturing system with sequence dependent setup and maintenance Hendra Teja Wirawan Sivakumar A. I. Stephen Graves Singapore-MIT Alliance Programme DRNTU::Engineering::Manufacturing Few researches in scheduling literature have considered setup and maintenance concurrently. This thesis analyzes sequence-dependent setup scheduling problem with non-resumable case of maintenance consideration to minimize makespan (maximizing utilization) on a single machine. Some parts of machine time are required for setup and maintenance activity, and in this study it is assumed that these two can be performed simultaneously. The analysis is divided into three parts, based on its job arrival and maintenance period assumption. Algorithms with dynamic job arrival assumption are tested on historical data of an actual semiconductor testing facility system. It is observed that the proposed algorithms are able to improve machine productive utilization by up to ~6% and average WIP by up to --40%. DOCTOR OF PHILOSOPHY (IMST) 2015-06-04T08:01:51Z 2015-06-04T08:01:51Z 2013 2013 Thesis Hendra Teja Wirawan. (2013). Scheduling manufacturing system with sequence dependent setup and maintenance. Doctoral thesis, Nanyang Technological University, Singapore. https://hdl.handle.net/10356/64823 10.32657/10356/64823 en 237 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Manufacturing |
spellingShingle |
DRNTU::Engineering::Manufacturing Hendra Teja Wirawan Scheduling manufacturing system with sequence dependent setup and maintenance |
description |
Few researches in scheduling literature have considered setup and maintenance concurrently. This thesis analyzes sequence-dependent setup scheduling problem with non-resumable case of maintenance consideration to minimize makespan (maximizing utilization) on a single machine. Some parts of machine time are required for setup and maintenance activity, and in this study it is assumed that these two can be performed simultaneously. The analysis is divided into three parts, based on its job arrival and maintenance period assumption. Algorithms with dynamic job arrival assumption are tested on historical data of an actual semiconductor testing facility system. It is observed that the proposed algorithms are able to improve machine productive utilization by up to ~6% and average WIP by up to --40%. |
author2 |
Sivakumar A. I. |
author_facet |
Sivakumar A. I. Hendra Teja Wirawan |
format |
Theses and Dissertations |
author |
Hendra Teja Wirawan |
author_sort |
Hendra Teja Wirawan |
title |
Scheduling manufacturing system with sequence dependent setup and maintenance |
title_short |
Scheduling manufacturing system with sequence dependent setup and maintenance |
title_full |
Scheduling manufacturing system with sequence dependent setup and maintenance |
title_fullStr |
Scheduling manufacturing system with sequence dependent setup and maintenance |
title_full_unstemmed |
Scheduling manufacturing system with sequence dependent setup and maintenance |
title_sort |
scheduling manufacturing system with sequence dependent setup and maintenance |
publishDate |
2015 |
url |
https://hdl.handle.net/10356/64823 |
_version_ |
1761781367940579328 |