Design of heated flow wind tunnel facility for testing small size ramjet engine combustors
This report documents the research studies on the design of a 'high speed heated flow wind tunnel facility', to test a 'Trapped Vortex Concept' (TVC) combustor of a ramjet engine, designed for the DSO National Laboratories, Singapore. The ramjet is to operate at flight s...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/65089 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Summary: | This report documents the research studies on the design of a 'high speed heated
flow wind tunnel facility', to test a 'Trapped Vortex Concept' (TVC) combustor of
a ramjet engine, designed for the DSO National Laboratories, Singapore. The ramjet
is to operate at flight speeds of Mach 2.5 to 4.0. A direct-connect wind tunnel is
designed in order to test the ramjet combustor. Combustion testing can be carried
out when the wind tunnel is running. Pebble bed type heaters are used to heat the air
to the required operating conditions.
A thermodynamic cycle analysis was performed on the ramjet engine to estimate air
properties at the combustor inlet. The calculations revealed that even though the
flight is supersonic, the inlet condition to combustor was still subsonic (Mach 0.70
and 0.80 corresponding to flight speed of Mach 2.5 and 4.0 respectively). Hence the
wind tunnel was designed to run at subsonic speeds. A wind tunnel design was
developed to deliver the estimated air properties corresponding to maximum
operating conditions (Mach 0.80), at the combustor inlet. Specifications for
machinery such as compressor, air storage tank, pebble bed heater, etc were
estimated such as to provide the calculated operating conditions of the wind tunnel.
Finally pressure drop calculations were performed on the pipelines and fittings for
pipe line sizing of the facility. |
---|