Multi-objective dynamic scheduling of serial and batch manufacturing processes

The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cyc...

全面介紹

Saved in:
書目詳細資料
主要作者: Gupta, Amit Kumar
其他作者: Appa Iyer Sivakumar
格式: Theses and Dissertations
出版: 2008
主題:
在線閱讀:https://hdl.handle.net/10356/6552
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
機構: Nanyang Technological University
實物特徵
總結:The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cycle time variance, and (3) earliness and tardiness related objectives. The motivation for using these conflicting objectives is to simultaneously incorporate the manufacturer's as well as the customer's concerns in scheduling. The interest of the decision maker lies not in just achieving a single optimal solution, but in defining a trade-off curve so that the decision maker can operate the scheduling along the trade-off curve according to the dynamic needs of the manufacturing shop.