Multi-objective dynamic scheduling of serial and batch manufacturing processes

The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cyc...

Full description

Saved in:
Bibliographic Details
Main Author: Gupta, Amit Kumar
Other Authors: Appa Iyer Sivakumar
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:https://hdl.handle.net/10356/6552
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Description
Summary:The objective of this research is to characterize the control curves for the multi-objective dynamic scheduling (MODS) of serial and batch manufacturing processes. The pairs of conflicting objectives considered in this thesis are (1) mean cycle time and maximum tardiness, (2) mean cycle time and cycle time variance, and (3) earliness and tardiness related objectives. The motivation for using these conflicting objectives is to simultaneously incorporate the manufacturer's as well as the customer's concerns in scheduling. The interest of the decision maker lies not in just achieving a single optimal solution, but in defining a trade-off curve so that the decision maker can operate the scheduling along the trade-off curve according to the dynamic needs of the manufacturing shop.