Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis

The issue of future capacity of Changi airport in Singapore is currently the subject of much debate. Runway occupancy time is an important control parameter in enhancing the use of current infrastructure to increase capacity of existing runways. Due to land availability constraints in Singapore the...

Full description

Saved in:
Bibliographic Details
Main Author: Dhir Varun
Other Authors: Zhong Zhaowei
Format: Theses and Dissertations
Language:English
Published: 2015
Subjects:
Online Access:https://hdl.handle.net/10356/65675
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-65675
record_format dspace
spelling sg-ntu-dr.10356-656752023-03-11T17:56:12Z Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis Dhir Varun Zhong Zhaowei School of Mechanical and Aerospace Engineering DRNTU::Engineering::Aeronautical engineering The issue of future capacity of Changi airport in Singapore is currently the subject of much debate. Runway occupancy time is an important control parameter in enhancing the use of current infrastructure to increase capacity of existing runways. Due to land availability constraints in Singapore the construction of new runways is also limited. The realistic estimates of the effects of capacity enhancement are desirable, but these estimates are difficult. This research estimates the runway occupancy time and maximum runway capacity at Changi airport using AirTOp simulation software and Monte Carlo analysis. A model of Changi airport was simulated using AirTOp simulator software. The evaluation of runway occupancy time and runway capacity was done based on the flight arrival/departure data captured for 6600 movements from the Changi airport group website. The study analyzes runway occupancy times and runway capacity under different traffic mix scenarios. It also takes into account the increase in capacity that can be achieved after construction of the third runway is over. The results of this study indicate that runway occupancy time is not only dependant on size of the aircraft but also the sequencing of traffic mix on the runway at any given point of time. Larger separation interval times are required by aircraft pairs with small aircraft in lead compared to other aircraft pairs. The research also illustrates that by scheduling and sequencing flights in a certain sequence an increase of up' to 27% in existing runway capacity may be achieved. MASTER OF ENGINEERING (MAE) 2015-12-08T09:18:04Z 2015-12-08T09:18:04Z 2015 2015 Thesis Dhir Varun. (2015). Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis. Master's thesis, Nanyang Technological University, Singapore. https://hdl.handle.net/10356/65675 10.32657/10356/65675 en 121 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Aeronautical engineering
spellingShingle DRNTU::Engineering::Aeronautical engineering
Dhir Varun
Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
description The issue of future capacity of Changi airport in Singapore is currently the subject of much debate. Runway occupancy time is an important control parameter in enhancing the use of current infrastructure to increase capacity of existing runways. Due to land availability constraints in Singapore the construction of new runways is also limited. The realistic estimates of the effects of capacity enhancement are desirable, but these estimates are difficult. This research estimates the runway occupancy time and maximum runway capacity at Changi airport using AirTOp simulation software and Monte Carlo analysis. A model of Changi airport was simulated using AirTOp simulator software. The evaluation of runway occupancy time and runway capacity was done based on the flight arrival/departure data captured for 6600 movements from the Changi airport group website. The study analyzes runway occupancy times and runway capacity under different traffic mix scenarios. It also takes into account the increase in capacity that can be achieved after construction of the third runway is over. The results of this study indicate that runway occupancy time is not only dependant on size of the aircraft but also the sequencing of traffic mix on the runway at any given point of time. Larger separation interval times are required by aircraft pairs with small aircraft in lead compared to other aircraft pairs. The research also illustrates that by scheduling and sequencing flights in a certain sequence an increase of up' to 27% in existing runway capacity may be achieved.
author2 Zhong Zhaowei
author_facet Zhong Zhaowei
Dhir Varun
format Theses and Dissertations
author Dhir Varun
author_sort Dhir Varun
title Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
title_short Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
title_full Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
title_fullStr Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
title_full_unstemmed Estimation of runway capacity at Changi Airport using AirTOp and Monte Carlo analysis
title_sort estimation of runway capacity at changi airport using airtop and monte carlo analysis
publishDate 2015
url https://hdl.handle.net/10356/65675
_version_ 1761781464773427200