Aspects of cost reduction for highway bridges in Myanmar

The goal of this thesis work is to develop general guidelines for cost reduction methodology that would make efficient use of construction materials and technology in obtaining the optimal bridge design taking into account all expected cost from the design stage to the end of bridge life span. This...

Full description

Saved in:
Bibliographic Details
Main Author: Singh, Dharmendar.
Other Authors: Jahidul Alum
Format: Theses and Dissertations
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/6588
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-6588
record_format dspace
spelling sg-ntu-dr.10356-65882020-09-26T21:14:00Z Aspects of cost reduction for highway bridges in Myanmar Singh, Dharmendar. Jahidul Alum Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management The goal of this thesis work is to develop general guidelines for cost reduction methodology that would make efficient use of construction materials and technology in obtaining the optimal bridge design taking into account all expected cost from the design stage to the end of bridge life span. This cost includes agency costs, user costs and external costs. Master of Science (International Construction Management) 2008-09-17T11:48:19Z 2008-09-17T11:48:19Z 2002 2002 Thesis http://hdl.handle.net/10356/6588 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
country Singapore
collection DR-NTU
topic DRNTU::Engineering::Civil engineering::Construction management
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Singh, Dharmendar.
Aspects of cost reduction for highway bridges in Myanmar
description The goal of this thesis work is to develop general guidelines for cost reduction methodology that would make efficient use of construction materials and technology in obtaining the optimal bridge design taking into account all expected cost from the design stage to the end of bridge life span. This cost includes agency costs, user costs and external costs.
author2 Jahidul Alum
author_facet Jahidul Alum
Singh, Dharmendar.
format Theses and Dissertations
author Singh, Dharmendar.
author_sort Singh, Dharmendar.
title Aspects of cost reduction for highway bridges in Myanmar
title_short Aspects of cost reduction for highway bridges in Myanmar
title_full Aspects of cost reduction for highway bridges in Myanmar
title_fullStr Aspects of cost reduction for highway bridges in Myanmar
title_full_unstemmed Aspects of cost reduction for highway bridges in Myanmar
title_sort aspects of cost reduction for highway bridges in myanmar
publishDate 2008
url http://hdl.handle.net/10356/6588
_version_ 1681056134168838144