Deep excavation practices in Singapore
In land-scarce Singapore, almost all the high-rise building construction and largescale major civil engineering works like Expressway and Mass Rapid Transit System (MRT) require deep excavation. Various types of vertical wall systems such as soldier pile walls, contiguous bored pile walls, secan...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6610 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-6610 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-66102020-09-26T21:15:19Z Deep excavation practices in Singapore U Kar Winn Ting, Seng Kiong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Geotechnical In land-scarce Singapore, almost all the high-rise building construction and largescale major civil engineering works like Expressway and Mass Rapid Transit System (MRT) require deep excavation. Various types of vertical wall systems such as soldier pile walls, contiguous bored pile walls, secant pile walls and diaphragm walls are commonly used in deep excavation for basement car park and cut and cover tunnel construction for Expressways and MRT underground stations. Reinforced soil method and soil nailing are used to stabilize the vertical cut slopes in some places. Master of Science 2008-09-17T11:49:04Z 2008-09-17T11:49:04Z 2005 2005 Thesis http://hdl.handle.net/10356/6610 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Civil engineering::Geotechnical |
spellingShingle |
DRNTU::Engineering::Civil engineering::Geotechnical U Kar Winn Deep excavation practices in Singapore |
description |
In land-scarce Singapore, almost all the high-rise building construction and largescale
major civil engineering works like Expressway and Mass Rapid Transit System
(MRT) require deep excavation.
Various types of vertical wall systems such as soldier pile walls, contiguous bored
pile walls, secant pile walls and diaphragm walls are commonly used in deep excavation
for basement car park and cut and cover tunnel construction for Expressways and MRT
underground stations. Reinforced soil method and soil nailing are used to stabilize the
vertical cut slopes in some places. |
author2 |
Ting, Seng Kiong |
author_facet |
Ting, Seng Kiong U Kar Winn |
format |
Theses and Dissertations |
author |
U Kar Winn |
author_sort |
U Kar Winn |
title |
Deep excavation practices in Singapore |
title_short |
Deep excavation practices in Singapore |
title_full |
Deep excavation practices in Singapore |
title_fullStr |
Deep excavation practices in Singapore |
title_full_unstemmed |
Deep excavation practices in Singapore |
title_sort |
deep excavation practices in singapore |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/6610 |
_version_ |
1681056736821116928 |