Assuring quality of lift and escalator installation for urban rail projects
The main objective is to identify and study the influence of the most critical factors affecting the Site Survey, Delivery and Installation of Lifts and Escalators.
Saved in:
Main Author: | Gan, Kong Cheong |
---|---|
Other Authors: | Jahidul Alum |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6651 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Quality assurance in preparation and installation of marine piles for the construction of coastal structures in Singapore
by: Khoo, Ah Kim.
Published: (2009) -
Study on the applicability of safety management system in rail project
by: Ching, Stanley Swee Leng.
Published: (2008) -
Quality assurance in public housing : design and build vs conventional
by: Tan, Chuan Ping, et al.
Published: (2009) -
Implementation of urban railway projects
by: Tan, Wan Keng.
Published: (2008) -
Construction productivity of precast concrete installation on site
by: Ting, Darren Weiwen.
Published: (2012)