Success and pitfalls of the HDB design and build scheme
This dissertion attempts to provide an overview of the Design and Build scheme adoted by HDB and identify the rationale for implementing this arrangement. The whole process of the Design and Build scheme from tender to post contract will be elaborated.
Saved in:
Main Author: | Liew, Shuik Chin. |
---|---|
Other Authors: | Lim, Ewe Chye |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6675 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Quality management in HDB main upgrading programme
by: Lim, Tow Heam.
Published: (2008) -
Developing industrial buildings using design-and-build contract
by: Lau, Kil Wee.
Published: (2008) -
Use of project management software in HDB main upgrading project
by: Long, Say Jew.
Published: (2008) -
A study of buildability and productivity on design and build projects in the building industry
by: Yeo, Lock Hoe.
Published: (2008) -
Critical success factors (CSFS) framework of architecture, engineering and construction (AEC) firms for delivering green building projects
by: Li, Yuanyuan
Published: (2012)