A study of financing build-operate-transfer projects
This dissertation covers the basis of BOT techniques and their potential advantages and disadvantages for the participants in these projects.
Saved in:
Main Authors: | Li, Lynn Ying, Rogel Ramos Rabino |
---|---|
Other Authors: | Tiong, Robert Lee Kong |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6691 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Evaluation and competitive tendering of build-operate-transfer (BOT) projects
by: Tiong, Robert Lee Kong.
Published: (2009) -
Build-operate-transfer concept for infrastructure development in China
by: Kee, Cheng Teik.
Published: (2009) -
Project finance approach in public private participation projects
by: Raymond Sebastian
Published: (2013) -
Risk evaluation modelling in project finance
by: Chia, Thien Fook.
Published: (2009) -
A study of buildability and productivity on design and build projects in the building industry
by: Yeo, Lock Hoe.
Published: (2008)