Construction management of dredging and dumping works in reclamation project: a case study of Pulau Tekong reclamation project
Land reclamation projects are becoming more important and necessary for national planning of infrastructure construction and urbanization, especially for developing land-scarce countries as a result of rapid population growth. As reclamation projects, for e.g., land reclamation for commercial or ind...
Saved in:
Main Author: | Ne Win |
---|---|
Other Authors: | Wong, Wai Fan |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6702 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Stabilization of dredged clay slurry with carbide sludge (CS)-ground granulated blastfurnace slag (GGBS) for land reclamation
by: Li, Wentao
Published: (2022) -
Land reclamation & soil improvement using dredged slurry as fill
by: Lam, Kok Pang
Published: (2018) -
Feasibility study for reclamation of the closed Lorong Halus dumping ground
by: Jayapregasham Tharamapalan
Published: (2008) -
Substituting spent copper slag as a replacement for sand as fill material in land reclamation projects
by: Ng, Xiang Hui.
Published: (2012) -
CONSOLIDATION OF DREDGED CLAY IN RECLAMATIONS.
by: Lee, S.L, et al.
Published: (2014)