Risk management in MRT-construction project using probabilistic risk analysis
The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabil...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6712 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-6712 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-67122020-09-26T21:21:22Z Risk management in MRT-construction project using probabilistic risk analysis Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan Tiong, Robert Lee Kong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabilistic risk methodology. Master of Science (International Construction Management) 2008-09-17T11:51:39Z 2008-09-17T11:51:39Z 2005 2005 Thesis http://hdl.handle.net/10356/6712 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
country |
Singapore |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Civil engineering::Construction management |
spellingShingle |
DRNTU::Engineering::Civil engineering::Construction management Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan Risk management in MRT-construction project using probabilistic risk analysis |
description |
The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabilistic risk methodology. |
author2 |
Tiong, Robert Lee Kong |
author_facet |
Tiong, Robert Lee Kong Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan |
format |
Theses and Dissertations |
author |
Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan |
author_sort |
Pakkrisamy Kalaichelvan |
title |
Risk management in MRT-construction project using probabilistic risk analysis |
title_short |
Risk management in MRT-construction project using probabilistic risk analysis |
title_full |
Risk management in MRT-construction project using probabilistic risk analysis |
title_fullStr |
Risk management in MRT-construction project using probabilistic risk analysis |
title_full_unstemmed |
Risk management in MRT-construction project using probabilistic risk analysis |
title_sort |
risk management in mrt-construction project using probabilistic risk analysis |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/6712 |
_version_ |
1681059236190093312 |