Fast track construction of a research development building for multiple users
This dissertation aims to provide the reader with an insight into the construction management concepts adopted in a fast track construction project. Problems encountered during construction have also been highlighted to give the reader a realistic feel of the actual proceedings of the project.
Saved in:
Main Author: | Poh, John Wei Kiang. |
---|---|
Other Authors: | Tiong, Robert Lee Kong |
Format: | Theses and Dissertations |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6716 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Similar Items
-
Development of a knowledge-based expert system for the generation of building construction schedules
by: Wong, Woon Ping.
Published: (2009) -
Simulated annealing for multiple construction project scheduling with multiple resource constraints
by: Seyed Mohsen Shahandashti.
Published: (2009) -
Precast concrete construction for the building industry
by: Leow, Geok Mui.
Published: (2008) -
Construction productivity in Singapore using Obayashi's building automated construction system
by: Zhou, Ji.
Published: (2008) -
Measuring and improving construction productivity on Singapore building project
by: Liong, Julio
Published: (2014)