Forensic investigation of ettringite formation in hardened mass concrete structures

Ettringite as known as 3CaO•Al2O3•3CaSO4•32H2O( in chemistry abbreviation) which are found in concretes/cement mixtures are classified into two different groups; (Primary Ettringite as known as Type 1) or (Secondary Ettringite as know as Type 2 or Delayed Ettringite Formation {DEF}). Studies have s...

Full description

Saved in:
Bibliographic Details
Main Author: Chng, Sebastian Wee Tat
Other Authors: Fan Sau Cheong
Format: Final Year Project
Language:English
Published: 2016
Subjects:
Online Access:http://hdl.handle.net/10356/67368
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-67368
record_format dspace
spelling sg-ntu-dr.10356-673682023-03-03T16:52:36Z Forensic investigation of ettringite formation in hardened mass concrete structures Chng, Sebastian Wee Tat Fan Sau Cheong School of Civil and Environmental Engineering DRNTU::Engineering Ettringite as known as 3CaO•Al2O3•3CaSO4•32H2O( in chemistry abbreviation) which are found in concretes/cement mixtures are classified into two different groups; (Primary Ettringite as known as Type 1) or (Secondary Ettringite as know as Type 2 or Delayed Ettringite Formation {DEF}). Studies have shown that a certain type of Ettringite to be detrimental and affecting the overall concrete strength in a long period. However, the true identification of the root cause of the development of the Ettringite still remains as a doubt to most researchers. Primary Ettringites that are developed during hydration process have a positive effect as it regulates the settling process during the initial stage of concrete mixing. Hence, the presence of the Primary Ettringite does not create any significant stress to the concrete. In turn, Delayed Ettringite Formation (DEF) which are formed, at the later stage (28 days and beyond) in the concrete are shown to create damage and affecting the strength of the concrete. Hence, the strength of the concrete is unable to be maximise in accordance to its maturity as it projects to be. The formation of Delayed Ettringite Formation (DEFs) in the air voids of the Interface Transition Zone (ITZ) between the aggregates and cement paste is the main factor that harms the concrete strength from enveloping to its eventual stage. Various factor such as temperature, the hydration process and the amount of sulphur content presence in the concrete/cement mixture are some of the debatable root causes of the development of Delayed Ettringite Formation. In the investigation, the objective is to identify if high temperature coring and a certain percentage of sulphur content is the key elements that causes the development of Delayed Ettringite Formation and how its presence affect the compressive strength Bachelor of Engineering (Civil) 2016-05-16T05:25:29Z 2016-05-16T05:25:29Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/67368 en Nanyang Technological University 35 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Chng, Sebastian Wee Tat
Forensic investigation of ettringite formation in hardened mass concrete structures
description Ettringite as known as 3CaO•Al2O3•3CaSO4•32H2O( in chemistry abbreviation) which are found in concretes/cement mixtures are classified into two different groups; (Primary Ettringite as known as Type 1) or (Secondary Ettringite as know as Type 2 or Delayed Ettringite Formation {DEF}). Studies have shown that a certain type of Ettringite to be detrimental and affecting the overall concrete strength in a long period. However, the true identification of the root cause of the development of the Ettringite still remains as a doubt to most researchers. Primary Ettringites that are developed during hydration process have a positive effect as it regulates the settling process during the initial stage of concrete mixing. Hence, the presence of the Primary Ettringite does not create any significant stress to the concrete. In turn, Delayed Ettringite Formation (DEF) which are formed, at the later stage (28 days and beyond) in the concrete are shown to create damage and affecting the strength of the concrete. Hence, the strength of the concrete is unable to be maximise in accordance to its maturity as it projects to be. The formation of Delayed Ettringite Formation (DEFs) in the air voids of the Interface Transition Zone (ITZ) between the aggregates and cement paste is the main factor that harms the concrete strength from enveloping to its eventual stage. Various factor such as temperature, the hydration process and the amount of sulphur content presence in the concrete/cement mixture are some of the debatable root causes of the development of Delayed Ettringite Formation. In the investigation, the objective is to identify if high temperature coring and a certain percentage of sulphur content is the key elements that causes the development of Delayed Ettringite Formation and how its presence affect the compressive strength
author2 Fan Sau Cheong
author_facet Fan Sau Cheong
Chng, Sebastian Wee Tat
format Final Year Project
author Chng, Sebastian Wee Tat
author_sort Chng, Sebastian Wee Tat
title Forensic investigation of ettringite formation in hardened mass concrete structures
title_short Forensic investigation of ettringite formation in hardened mass concrete structures
title_full Forensic investigation of ettringite formation in hardened mass concrete structures
title_fullStr Forensic investigation of ettringite formation in hardened mass concrete structures
title_full_unstemmed Forensic investigation of ettringite formation in hardened mass concrete structures
title_sort forensic investigation of ettringite formation in hardened mass concrete structures
publishDate 2016
url http://hdl.handle.net/10356/67368
_version_ 1759855527223885824