Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)

A pilot-scale two-stage anaerobic fluidized membrane bioreactor (AFMBR) treating settled raw municipal wastewater (24 m3/day) was operated at Ulu Pandan Water Reclamation Plant, Singapore. The first stage was an anaerobic fluidized bed reactor (AFBR) followed by two parallel fluidized bed membrane b...

Full description

Saved in:
Bibliographic Details
Main Author: Ho, Chie Heng
Other Authors: Liu Yu
Format: Final Year Project
Language:English
Published: 2016
Subjects:
Online Access:http://hdl.handle.net/10356/67503
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-67503
record_format dspace
spelling sg-ntu-dr.10356-675032023-03-03T17:03:06Z Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR) Ho, Chie Heng Liu Yu School of Civil and Environmental Engineering Singapore Membrane Technology Centre DRNTU::Engineering A pilot-scale two-stage anaerobic fluidized membrane bioreactor (AFMBR) treating settled raw municipal wastewater (24 m3/day) was operated at Ulu Pandan Water Reclamation Plant, Singapore. The first stage was an anaerobic fluidized bed reactor (AFBR) followed by two parallel fluidized bed membrane bioreactors, namely flat sheet and hollow fibre AFMBR as the second stage respectively. This study was conducted to examine the reactor and membrane performances, biogas production, and energy consumption of each two-stage AFMBR. The reactor and membrane performances of the pilot AFMBR were evaluated in this study. More than 87% of total chemical oxygen demand (COD), 69% of soluble COD, 81% of total organic carbon (TOC), and almost 100% of total suspended solids (TSS) were removed in the two-stage AFMBR, almost regardless of membrane configuration. However, slightly better removal efficiencies were observed in the hollow fibre system. In detail, on an average, the first-stage AFBR effectively removed 37% of total COD, 42% of soluble COD, 49% of TOC, and 38% of TSS, while the attached-biofilm on the GAC particles in the second-stage AFMBR further removed some of the residual soluble organics at a ratio of 18% of total COD, and 17% of soluble COD, 23% of TOC, and 31% of TSS in hollow fibre AFMBR and 27% of total COD, 20% of soluble COD, 25% of TOC, and 34% of TSS in flat sheet AFMBR. The transmembrane pressure was recorded daily and an averaged value of 0.21 bar and 0.08 bar was observed for hollow fibre and flat sheet AFMBR respectively at a designed membrane flux of 5.5 L/m2.h. The transmembrane pressure was considerably lower than the maximum allowable value (0.3 bar), which indicated that membrane fouling was negligible. In addition, total carbon balance was performed for the two-stage AFMBR. Gaseous methane production was the largest with a COD conversion of 42.6% while only 23.4% of COD was converted to dissolved methane. Lastly, the energy consumption was evaluated and the calculated energy required for two-stage hollow fibre and flat sheet AFMBR was 0.136 kWh/m3 and 0.151 kWh/m3 respectively. The energy produced by gaseous methane was 0.045 kWh/m3 and 0.061 kWh/m3 for two-stage hollow fibre and flat sheet AFMBR respectively, which could only satisfy 33% of the energy required. Bachelor of Engineering (Environmental Engineering) 2016-05-17T06:30:37Z 2016-05-17T06:30:37Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/67503 en Nanyang Technological University 44 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Ho, Chie Heng
Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
description A pilot-scale two-stage anaerobic fluidized membrane bioreactor (AFMBR) treating settled raw municipal wastewater (24 m3/day) was operated at Ulu Pandan Water Reclamation Plant, Singapore. The first stage was an anaerobic fluidized bed reactor (AFBR) followed by two parallel fluidized bed membrane bioreactors, namely flat sheet and hollow fibre AFMBR as the second stage respectively. This study was conducted to examine the reactor and membrane performances, biogas production, and energy consumption of each two-stage AFMBR. The reactor and membrane performances of the pilot AFMBR were evaluated in this study. More than 87% of total chemical oxygen demand (COD), 69% of soluble COD, 81% of total organic carbon (TOC), and almost 100% of total suspended solids (TSS) were removed in the two-stage AFMBR, almost regardless of membrane configuration. However, slightly better removal efficiencies were observed in the hollow fibre system. In detail, on an average, the first-stage AFBR effectively removed 37% of total COD, 42% of soluble COD, 49% of TOC, and 38% of TSS, while the attached-biofilm on the GAC particles in the second-stage AFMBR further removed some of the residual soluble organics at a ratio of 18% of total COD, and 17% of soluble COD, 23% of TOC, and 31% of TSS in hollow fibre AFMBR and 27% of total COD, 20% of soluble COD, 25% of TOC, and 34% of TSS in flat sheet AFMBR. The transmembrane pressure was recorded daily and an averaged value of 0.21 bar and 0.08 bar was observed for hollow fibre and flat sheet AFMBR respectively at a designed membrane flux of 5.5 L/m2.h. The transmembrane pressure was considerably lower than the maximum allowable value (0.3 bar), which indicated that membrane fouling was negligible. In addition, total carbon balance was performed for the two-stage AFMBR. Gaseous methane production was the largest with a COD conversion of 42.6% while only 23.4% of COD was converted to dissolved methane. Lastly, the energy consumption was evaluated and the calculated energy required for two-stage hollow fibre and flat sheet AFMBR was 0.136 kWh/m3 and 0.151 kWh/m3 respectively. The energy produced by gaseous methane was 0.045 kWh/m3 and 0.061 kWh/m3 for two-stage hollow fibre and flat sheet AFMBR respectively, which could only satisfy 33% of the energy required.
author2 Liu Yu
author_facet Liu Yu
Ho, Chie Heng
format Final Year Project
author Ho, Chie Heng
author_sort Ho, Chie Heng
title Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
title_short Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
title_full Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
title_fullStr Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
title_full_unstemmed Monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (AFMBR)
title_sort monitoring performance of a pilot two-stage anaerobic fluidized membrane bioreactor (afmbr)
publishDate 2016
url http://hdl.handle.net/10356/67503
_version_ 1759853998388543488