Smart and semi-automated precast elements logistics management and installation system : smart crane navigation system
The past decade saw the shift towards the reliance of technology in many fields of work in order to raise productivity and safety. However, this shift was not as significant in the construction field. This urged the Building & Construction Authority in Singapore to introduce the Construction Pro...
Saved in:
Main Author: | Ng, Jolin Xue Qi |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/68058 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
Logistics management of the precast elements for industrial scale construction project through BIM-based semi-automated smart crane system
by: Chan, Wan Rong
Published: (2017) -
Effectiveness evaluation of smart crane system for precast building construction
by: Lee, Jong Won
Published: (2017) -
Integrating BIM with positioning system to develop a precast installation system
by: Zhou, Yitian
Published: (2016) -
A development on the integration of BIM with RFID to improve the precast logistic management and installation system
by: Lee, Bernice Ser Li
Published: (2021) -
A study on application of local positioning systems at construction sites for precast installation
by: Liu, Huaiyuan
Published: (2017)