Development of an integrated project cost-time-resources simulation and economic evaluation system
The purpose of this report is to present a framework for the definition, design and implementation of a microcomputer based project management and economic analysis model.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Research Report |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6810 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
id |
sg-ntu-dr.10356-6810 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-68102023-03-04T18:07:16Z Development of an integrated project cost-time-resources simulation and economic evaluation system Yeo, Khim Teck. School of Mechanical and Production Engineering DRNTU::Engineering::Systems engineering The purpose of this report is to present a framework for the definition, design and implementation of a microcomputer based project management and economic analysis model. RP 22184 2008-09-17T14:35:03Z 2008-09-17T14:35:03Z 1987 1987 Research Report http://hdl.handle.net/10356/6810 Nanyang Technological University application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
topic |
DRNTU::Engineering::Systems engineering |
spellingShingle |
DRNTU::Engineering::Systems engineering Yeo, Khim Teck. Development of an integrated project cost-time-resources simulation and economic evaluation system |
description |
The purpose of this report is to present a framework for the definition, design and implementation of a microcomputer based project management and economic analysis model. |
author2 |
School of Mechanical and Production Engineering |
author_facet |
School of Mechanical and Production Engineering Yeo, Khim Teck. |
format |
Research Report |
author |
Yeo, Khim Teck. |
author_sort |
Yeo, Khim Teck. |
title |
Development of an integrated project cost-time-resources simulation and economic evaluation system |
title_short |
Development of an integrated project cost-time-resources simulation and economic evaluation system |
title_full |
Development of an integrated project cost-time-resources simulation and economic evaluation system |
title_fullStr |
Development of an integrated project cost-time-resources simulation and economic evaluation system |
title_full_unstemmed |
Development of an integrated project cost-time-resources simulation and economic evaluation system |
title_sort |
development of an integrated project cost-time-resources simulation and economic evaluation system |
publishDate |
2008 |
url |
http://hdl.handle.net/10356/6810 |
_version_ |
1759854555080687616 |