Formulation of standard test procedure for HALON 1301 total flooding system discharge test

Test procedures for the full scale discharge test of HALON 1301 total flooding system were formulated. The procedures were designed to test the total performance of the 'system', which comprises detection and activation; alarms and displays; protective interlocks; and of course the ability...

Full description

Saved in:
Bibliographic Details
Main Author: Wong, Kin Man.
Other Authors: School of Mechanical and Production Engineering
Format: Research Report
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/6818
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
id sg-ntu-dr.10356-6818
record_format dspace
spelling sg-ntu-dr.10356-68182023-03-04T18:08:07Z Formulation of standard test procedure for HALON 1301 total flooding system discharge test Wong, Kin Man. School of Mechanical and Production Engineering DRNTU::Engineering::Chemical engineering::Chemical processes Test procedures for the full scale discharge test of HALON 1301 total flooding system were formulated. The procedures were designed to test the total performance of the 'system', which comprises detection and activation; alarms and displays; protective interlocks; and of course the ability of the total flooding system in achieving the key design parameters. ARP-M-20-85 2008-09-17T14:35:11Z 2008-09-17T14:35:11Z 1989 1989 Research Report http://hdl.handle.net/10356/6818 Nanyang Technological University application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
topic DRNTU::Engineering::Chemical engineering::Chemical processes
spellingShingle DRNTU::Engineering::Chemical engineering::Chemical processes
Wong, Kin Man.
Formulation of standard test procedure for HALON 1301 total flooding system discharge test
description Test procedures for the full scale discharge test of HALON 1301 total flooding system were formulated. The procedures were designed to test the total performance of the 'system', which comprises detection and activation; alarms and displays; protective interlocks; and of course the ability of the total flooding system in achieving the key design parameters.
author2 School of Mechanical and Production Engineering
author_facet School of Mechanical and Production Engineering
Wong, Kin Man.
format Research Report
author Wong, Kin Man.
author_sort Wong, Kin Man.
title Formulation of standard test procedure for HALON 1301 total flooding system discharge test
title_short Formulation of standard test procedure for HALON 1301 total flooding system discharge test
title_full Formulation of standard test procedure for HALON 1301 total flooding system discharge test
title_fullStr Formulation of standard test procedure for HALON 1301 total flooding system discharge test
title_full_unstemmed Formulation of standard test procedure for HALON 1301 total flooding system discharge test
title_sort formulation of standard test procedure for halon 1301 total flooding system discharge test
publishDate 2008
url http://hdl.handle.net/10356/6818
_version_ 1759856021412511744