Determining the impact of unexpected disruptions to a complex supply chain

This final year project deals with simulating disruptions in a multi-echelon supply chain and the objective is to study the propagation of such disruptions and also the factors affecting such disruptions. Different simulation techniques were reviewed and studied before discrete event simulation (DE...

Full description

Saved in:
Bibliographic Details
Main Author: Aw, Waldron Jun Jie
Other Authors: Lee Siang Guan, Stephen
Format: Final Year Project
Language:English
Published: 2016
Subjects:
Online Access:http://hdl.handle.net/10356/68445
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-68445
record_format dspace
spelling sg-ntu-dr.10356-684452023-03-04T19:24:19Z Determining the impact of unexpected disruptions to a complex supply chain Aw, Waldron Jun Jie Lee Siang Guan, Stephen School of Mechanical and Aerospace Engineering A*STAR Singapore Institute of Manufacturing Technology DRNTU::Engineering This final year project deals with simulating disruptions in a multi-echelon supply chain and the objective is to study the propagation of such disruptions and also the factors affecting such disruptions. Different simulation techniques were reviewed and studied before discrete event simulation (DES) was chosen as inventory levels are of interest in this project and inventory levels in a supply chain evolve over time due to discrete events. A FlexSim model was created to study the propagation of disruptions in a supply chain. Verification was done by checking the structure, code and animated flow of the entities. As real life data was not available, validation was carried out based on data provided by SIMTech that was derived using an time based Input-output model (I-O model that had been developed and validated previously by SIMTech). After the FlexSim model had been verified and validated, disruptions were introduced at various locations in the supply chain so that the propagation of disruptions can be studied. Based on the results of the simulation model, critical nodes were identified and the factors leading to these nodes being critical were studied, analyzed and given weights. The analysis showed that trading volume and BOM are important factors that render nodes critical. The results also show that the disruption experienced by the end consumer does not change much when there are additional disruptions downstream of critical nodes. However, the disruption propagated to the end consumer fluctuates differently when there are additional disruptions downstream of critical nodes. These findings allow managers to prioritize nodes when planning and to take mitigating actions to manage the effects of disruptive events. Bachelor of Engineering (Aerospace Engineering) 2016-05-26T02:42:36Z 2016-05-26T02:42:36Z 2016 Final Year Project (FYP) http://hdl.handle.net/10356/68445 en Nanyang Technological University 83 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Aw, Waldron Jun Jie
Determining the impact of unexpected disruptions to a complex supply chain
description This final year project deals with simulating disruptions in a multi-echelon supply chain and the objective is to study the propagation of such disruptions and also the factors affecting such disruptions. Different simulation techniques were reviewed and studied before discrete event simulation (DES) was chosen as inventory levels are of interest in this project and inventory levels in a supply chain evolve over time due to discrete events. A FlexSim model was created to study the propagation of disruptions in a supply chain. Verification was done by checking the structure, code and animated flow of the entities. As real life data was not available, validation was carried out based on data provided by SIMTech that was derived using an time based Input-output model (I-O model that had been developed and validated previously by SIMTech). After the FlexSim model had been verified and validated, disruptions were introduced at various locations in the supply chain so that the propagation of disruptions can be studied. Based on the results of the simulation model, critical nodes were identified and the factors leading to these nodes being critical were studied, analyzed and given weights. The analysis showed that trading volume and BOM are important factors that render nodes critical. The results also show that the disruption experienced by the end consumer does not change much when there are additional disruptions downstream of critical nodes. However, the disruption propagated to the end consumer fluctuates differently when there are additional disruptions downstream of critical nodes. These findings allow managers to prioritize nodes when planning and to take mitigating actions to manage the effects of disruptive events.
author2 Lee Siang Guan, Stephen
author_facet Lee Siang Guan, Stephen
Aw, Waldron Jun Jie
format Final Year Project
author Aw, Waldron Jun Jie
author_sort Aw, Waldron Jun Jie
title Determining the impact of unexpected disruptions to a complex supply chain
title_short Determining the impact of unexpected disruptions to a complex supply chain
title_full Determining the impact of unexpected disruptions to a complex supply chain
title_fullStr Determining the impact of unexpected disruptions to a complex supply chain
title_full_unstemmed Determining the impact of unexpected disruptions to a complex supply chain
title_sort determining the impact of unexpected disruptions to a complex supply chain
publishDate 2016
url http://hdl.handle.net/10356/68445
_version_ 1759858006452862976