A study on the productivity evaluation of building information modelling (BIM) based prefabricated prefinished volumetric construction (PPVC) project
In line with the Building and Construction Authority’s (BCA) target to improve construction productivity, the industry is currently moving towards more productive technologies that will achieve higher productivity gains. Of these productive technologies, BIM and PPVC were identified by the authority...
Saved in:
Main Author: | Fernandez, Priscilla Crystal |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project |
Language: | English |
Published: |
2017
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/70998 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
Similar Items
-
A modular system for prefabricated prefinished volumetric construction (PPVC) - member behaviour
by: Ng, Maggie
Published: (2015) -
Structural health monitoring of Prefabricated Prefinished Volumetric Construction (PPVC) unit connectors
by: Muhammad Syafiq Mohd Amin
Published: (2020) -
Load bearing capacity of prefinished prefabricated volumetric construction (PPVC) shear key connections
by: Ong, Kai Hong
Published: (2021) -
BIM-ENABLED ASSESSMENT AND MITIGATION OF EMBODIED CARBON FOR PREFABRICATED PREFINISHED VOLUMETRIC CONSTRUCTION (PPVC)
by: LIM KAI MUN ALYNA
Published: (2023) -
ADOPTING PREFABRICATED PREFINISHED VOLUMETRIC CONSTRUCTION (PPVC) TO IMPROVE CONSTRUCTION PRODUCTIVITY
by: TAO JUNLIN GRACIOUS
Published: (2017)