A study on integrating BIM with RFID to develop a PPVC logistic management and installation system

Low efficiency and low level of productivity constantly plague the construction industry in Singapore. Under this situation, the Building and Construction Authority (BCA) unveiled a research and development (R&D) roadmap, which indicates that using of advanced technologies and innovation to boos...

Full description

Saved in:
Bibliographic Details
Main Author: Wu, Heng
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project
Language:English
Published: 2017
Subjects:
Online Access:http://hdl.handle.net/10356/71346
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-71346
record_format dspace
spelling sg-ntu-dr.10356-713462023-03-03T17:09:02Z A study on integrating BIM with RFID to develop a PPVC logistic management and installation system Wu, Heng Tiong Lee Kong, Robert School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering Low efficiency and low level of productivity constantly plague the construction industry in Singapore. Under this situation, the Building and Construction Authority (BCA) unveiled a research and development (R&D) roadmap, which indicates that using of advanced technologies and innovation to boost construction productivity. This R&D roadmap identified 35 key technologies under seven clusters, including Design for Manufacturing and Assembly (DfMA) and Building Information Modelling (BIM). DfMA is the combination of the design for ease of manufacture of the parts that will form a product (Design for Manufacture), and the design of the product for ease of assembly (Design for Assembly). Prefabricated Pre-Finished Volumetric Construction (PPVC) is an example of DfMA, which means manufacturing certain parts of the building work at factories (off-site) and then transport them to the actual site for assembly (on-site) – overlap some construction activities to lift productivity and ensure better quality under a controlled environment. It fundamentally changes the design and construction processes compared to the traditional cast-in-situ method. Moreover, BIM is a computer - aided technology which 3-D Virtual Design could virtualize the construction process, significantly improves construction productivity by pre-determination of design conflicts or constructability issues to reduce or even avoid rework and idle time for laborers. Furthermore, Radio Frequency Identification technology (RFID) provides effective items tracking and inventory management in the construction supply chains to further improve construction productivity. This Final Year Project explores the adoption of PPVC Technology in Singapore. Based on two case study projects, the benefits, as well as limitations of PPVC Technology have been identified. Integration both BIM and RFID to develop a PPVC Logistic Management and Installation System is technologically feasible and efficient to improve construction productivity. Bachelor of Engineering (Civil) 2017-05-16T06:07:02Z 2017-05-16T06:07:02Z 2017 Final Year Project (FYP) http://hdl.handle.net/10356/71346 en Nanyang Technological University 58 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Civil engineering
spellingShingle DRNTU::Engineering::Civil engineering
Wu, Heng
A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
description Low efficiency and low level of productivity constantly plague the construction industry in Singapore. Under this situation, the Building and Construction Authority (BCA) unveiled a research and development (R&D) roadmap, which indicates that using of advanced technologies and innovation to boost construction productivity. This R&D roadmap identified 35 key technologies under seven clusters, including Design for Manufacturing and Assembly (DfMA) and Building Information Modelling (BIM). DfMA is the combination of the design for ease of manufacture of the parts that will form a product (Design for Manufacture), and the design of the product for ease of assembly (Design for Assembly). Prefabricated Pre-Finished Volumetric Construction (PPVC) is an example of DfMA, which means manufacturing certain parts of the building work at factories (off-site) and then transport them to the actual site for assembly (on-site) – overlap some construction activities to lift productivity and ensure better quality under a controlled environment. It fundamentally changes the design and construction processes compared to the traditional cast-in-situ method. Moreover, BIM is a computer - aided technology which 3-D Virtual Design could virtualize the construction process, significantly improves construction productivity by pre-determination of design conflicts or constructability issues to reduce or even avoid rework and idle time for laborers. Furthermore, Radio Frequency Identification technology (RFID) provides effective items tracking and inventory management in the construction supply chains to further improve construction productivity. This Final Year Project explores the adoption of PPVC Technology in Singapore. Based on two case study projects, the benefits, as well as limitations of PPVC Technology have been identified. Integration both BIM and RFID to develop a PPVC Logistic Management and Installation System is technologically feasible and efficient to improve construction productivity.
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Wu, Heng
format Final Year Project
author Wu, Heng
author_sort Wu, Heng
title A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
title_short A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
title_full A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
title_fullStr A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
title_full_unstemmed A study on integrating BIM with RFID to develop a PPVC logistic management and installation system
title_sort study on integrating bim with rfid to develop a ppvc logistic management and installation system
publishDate 2017
url http://hdl.handle.net/10356/71346
_version_ 1759857867938070528