Optimization of the operating parameters of membrane bio-reactor

The application nanofiber flat sheet membrane for wastewater treatment is relatively new. Flat sheet nanofibers possess larger surface area to volume ratio provides the opportunity of increasing water permeation. The understanding on its potential applicability remains unanswered. Hence, this study...

Full description

Saved in:
Bibliographic Details
Main Author: Wee, Tio
Other Authors: Sun Delai, Darren
Format: Final Year Project
Language:English
Published: 2017
Subjects:
Online Access:http://hdl.handle.net/10356/71804
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-71804
record_format dspace
spelling sg-ntu-dr.10356-718042023-03-03T17:11:31Z Optimization of the operating parameters of membrane bio-reactor Wee, Tio Sun Delai, Darren School of Civil and Environmental Engineering DRNTU::Engineering::Environmental engineering::Water treatment The application nanofiber flat sheet membrane for wastewater treatment is relatively new. Flat sheet nanofibers possess larger surface area to volume ratio provides the opportunity of increasing water permeation. The understanding on its potential applicability remains unanswered. Hence, this study intends to focus on the feasibility of using the flat sheet nanofiber membrane in a closed looped membrane bioreactor set up treating sewage. In this study, a closed looped membrane bioreactor system to treat synthetic wastewater was designed, set-up and operated with the nanofiber flat sheet membrane for 152 days. This was to assess its feasibility as new generation membrane which could replace the current membrane technology. The study was divided into three phase. The set-up phase, to set up the physical structure of membrane bioreactor and ensure the structural and hydraulic integrity of the system. Follow by, the start-up phase to provide conditions for the flourishment of the microbial community in the membrane bioreactor system. Lastly, the optimization phase to study the feasibility of running the membrane bioreactor with high flux output while maintaining the intended treatment objective. The removal efficiencies of the membrane bioreactor in terms of Biochemical Oxygen Demand, Chemical Oxygen Demand and Total Organic Carbon were studied with varying the operating conditions such as hydraulic retention time and solid retention time. The membrane bioreactor could produce a stable flux of 33 litres per square meter per hour while delivering its intended treatment objective. It was found that the membrane bioreactor could remove 99.55% of Biochemical Oxygen Demand, 97.70% of Chemical Oxygen Demand and 97.75% of Total Organic Carbon from the synthetic wastewater source. Bachelor of Engineering (Environmental Engineering) 2017-05-19T04:15:51Z 2017-05-19T04:15:51Z 2017 Final Year Project (FYP) http://hdl.handle.net/10356/71804 en Nanyang Technological University 42 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Environmental engineering::Water treatment
spellingShingle DRNTU::Engineering::Environmental engineering::Water treatment
Wee, Tio
Optimization of the operating parameters of membrane bio-reactor
description The application nanofiber flat sheet membrane for wastewater treatment is relatively new. Flat sheet nanofibers possess larger surface area to volume ratio provides the opportunity of increasing water permeation. The understanding on its potential applicability remains unanswered. Hence, this study intends to focus on the feasibility of using the flat sheet nanofiber membrane in a closed looped membrane bioreactor set up treating sewage. In this study, a closed looped membrane bioreactor system to treat synthetic wastewater was designed, set-up and operated with the nanofiber flat sheet membrane for 152 days. This was to assess its feasibility as new generation membrane which could replace the current membrane technology. The study was divided into three phase. The set-up phase, to set up the physical structure of membrane bioreactor and ensure the structural and hydraulic integrity of the system. Follow by, the start-up phase to provide conditions for the flourishment of the microbial community in the membrane bioreactor system. Lastly, the optimization phase to study the feasibility of running the membrane bioreactor with high flux output while maintaining the intended treatment objective. The removal efficiencies of the membrane bioreactor in terms of Biochemical Oxygen Demand, Chemical Oxygen Demand and Total Organic Carbon were studied with varying the operating conditions such as hydraulic retention time and solid retention time. The membrane bioreactor could produce a stable flux of 33 litres per square meter per hour while delivering its intended treatment objective. It was found that the membrane bioreactor could remove 99.55% of Biochemical Oxygen Demand, 97.70% of Chemical Oxygen Demand and 97.75% of Total Organic Carbon from the synthetic wastewater source.
author2 Sun Delai, Darren
author_facet Sun Delai, Darren
Wee, Tio
format Final Year Project
author Wee, Tio
author_sort Wee, Tio
title Optimization of the operating parameters of membrane bio-reactor
title_short Optimization of the operating parameters of membrane bio-reactor
title_full Optimization of the operating parameters of membrane bio-reactor
title_fullStr Optimization of the operating parameters of membrane bio-reactor
title_full_unstemmed Optimization of the operating parameters of membrane bio-reactor
title_sort optimization of the operating parameters of membrane bio-reactor
publishDate 2017
url http://hdl.handle.net/10356/71804
_version_ 1759853146504429568