Tower crane lifting

Abstract Tower crane lifting is a common procedure deployed in constructions. In order to optimized the use of a tower crane and come up with a cost effective way and optimized the use of a tower crane, a Master–Slave Parallel Genetic Algorithm and implement the algorithm on Graphics Processing Un...

Full description

Saved in:
Bibliographic Details
Main Author: Loh, Weisong
Other Authors: Cai Yiyu
Format: Final Year Project
Language:English
Published: 2017
Subjects:
Online Access:http://hdl.handle.net/10356/72247
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-72247
record_format dspace
spelling sg-ntu-dr.10356-722472023-03-04T18:47:28Z Tower crane lifting Loh, Weisong Cai Yiyu School of Mechanical and Aerospace Engineering DRNTU::Engineering::Mechanical engineering Abstract Tower crane lifting is a common procedure deployed in constructions. In order to optimized the use of a tower crane and come up with a cost effective way and optimized the use of a tower crane, a Master–Slave Parallel Genetic Algorithm and implement the algorithm on Graphics Processing Units using CUDA programming is developed to calculate a lifting path plan. Currently this algorithm is under testing phase and it is necessary to do a physical trial with a scaled down tower crane model to test the integration of both software algorithm calculation and match to the physical crane lifting. All this obstacle needs to be cleared before this algorithm can introduced to crane industry. Due to heavy and complex works of the construction sites, safety is utmost importance and a safe collision avoidance pathway system is necessary for safe operation of a tower crane lifting. In this project, a scaled down fully functional tower tower crane based on Terex SK 415-20 is designed and builded. Master–Slave Parallel Genetic Algorithm will be used for calculating the optimized lifting path which will be executed by the tower crane model. The tower crane moves accordingly in the designated 3 degree-of-freedom space according to the data and performs the lifting task. In the final part, the tower crane model is tested and reviewed. Suggestions are given for future study on crane lifting to improve on the movement precision and related studies. Bachelor of Engineering (Mechanical Engineering) 2017-05-30T09:00:28Z 2017-05-30T09:00:28Z 2017 Final Year Project (FYP) http://hdl.handle.net/10356/72247 en Nanyang Technological University 45 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Mechanical engineering
spellingShingle DRNTU::Engineering::Mechanical engineering
Loh, Weisong
Tower crane lifting
description Abstract Tower crane lifting is a common procedure deployed in constructions. In order to optimized the use of a tower crane and come up with a cost effective way and optimized the use of a tower crane, a Master–Slave Parallel Genetic Algorithm and implement the algorithm on Graphics Processing Units using CUDA programming is developed to calculate a lifting path plan. Currently this algorithm is under testing phase and it is necessary to do a physical trial with a scaled down tower crane model to test the integration of both software algorithm calculation and match to the physical crane lifting. All this obstacle needs to be cleared before this algorithm can introduced to crane industry. Due to heavy and complex works of the construction sites, safety is utmost importance and a safe collision avoidance pathway system is necessary for safe operation of a tower crane lifting. In this project, a scaled down fully functional tower tower crane based on Terex SK 415-20 is designed and builded. Master–Slave Parallel Genetic Algorithm will be used for calculating the optimized lifting path which will be executed by the tower crane model. The tower crane moves accordingly in the designated 3 degree-of-freedom space according to the data and performs the lifting task. In the final part, the tower crane model is tested and reviewed. Suggestions are given for future study on crane lifting to improve on the movement precision and related studies.
author2 Cai Yiyu
author_facet Cai Yiyu
Loh, Weisong
format Final Year Project
author Loh, Weisong
author_sort Loh, Weisong
title Tower crane lifting
title_short Tower crane lifting
title_full Tower crane lifting
title_fullStr Tower crane lifting
title_full_unstemmed Tower crane lifting
title_sort tower crane lifting
publishDate 2017
url http://hdl.handle.net/10356/72247
_version_ 1759854052569513984