Deployment and test of microgrid power park - part II

Microgrid is define as a group of interconnected loads and distributed energy resources. It is an energy system that manage energy distribution and provide power efficiently within a geographical area. Power converters were often used in microgrids and they were used to step up or step down the vol...

Full description

Saved in:
Bibliographic Details
Main Author: Ng, Shi Jun
Other Authors: Wang Peng
Format: Final Year Project
Language:English
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/10356/74467
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-74467
record_format dspace
spelling sg-ntu-dr.10356-744672023-07-07T17:14:27Z Deployment and test of microgrid power park - part II Ng, Shi Jun Wang Peng School of Electrical and Electronic Engineering DRNTU::Engineering Microgrid is define as a group of interconnected loads and distributed energy resources. It is an energy system that manage energy distribution and provide power efficiently within a geographical area. Power converters were often used in microgrids and they were used to step up or step down the voltages depending on the targeted application. It can be used for more complicated systems that requires various power conversions such as AC to DC or DC to AC. A circuit of the converter will be required for this project and it will be built from scratch on a PCB board. This PCB board has a flexible combination, it can function as a buck or a boost converter, an inverter or act as a rectifier. The project will be using a voltage source inverter to convert DC to AC power and other parts of the power converter system will be simulated through MATLAB and Control desk. Bachelor of Engineering 2018-05-18T05:12:19Z 2018-05-18T05:12:19Z 2018 Final Year Project (FYP) http://hdl.handle.net/10356/74467 en Nanyang Technological University 55 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering
spellingShingle DRNTU::Engineering
Ng, Shi Jun
Deployment and test of microgrid power park - part II
description Microgrid is define as a group of interconnected loads and distributed energy resources. It is an energy system that manage energy distribution and provide power efficiently within a geographical area. Power converters were often used in microgrids and they were used to step up or step down the voltages depending on the targeted application. It can be used for more complicated systems that requires various power conversions such as AC to DC or DC to AC. A circuit of the converter will be required for this project and it will be built from scratch on a PCB board. This PCB board has a flexible combination, it can function as a buck or a boost converter, an inverter or act as a rectifier. The project will be using a voltage source inverter to convert DC to AC power and other parts of the power converter system will be simulated through MATLAB and Control desk.
author2 Wang Peng
author_facet Wang Peng
Ng, Shi Jun
format Final Year Project
author Ng, Shi Jun
author_sort Ng, Shi Jun
title Deployment and test of microgrid power park - part II
title_short Deployment and test of microgrid power park - part II
title_full Deployment and test of microgrid power park - part II
title_fullStr Deployment and test of microgrid power park - part II
title_full_unstemmed Deployment and test of microgrid power park - part II
title_sort deployment and test of microgrid power park - part ii
publishDate 2018
url http://hdl.handle.net/10356/74467
_version_ 1772828920864833536