Deployment and test of micro-grid power park - part I

Renewable resources and micro-grids are resurfacing in-lieu of the increasing concerns in energy crises and global warming. The aim of this project was to assemble of hardware, calibration of sensors, design and test a control software that governs the operation and stability of a three-phase invert...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Jun Guo
Other Authors: Wang Peng
Format: Final Year Project
Language:English
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/10356/74551
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:Renewable resources and micro-grids are resurfacing in-lieu of the increasing concerns in energy crises and global warming. The aim of this project was to assemble of hardware, calibration of sensors, design and test a control software that governs the operation and stability of a three-phase inverter so to allow the integration of DC resources onto a AC micro-grid environment. The experiment was carried out to obtain a three-phase sinusoidal output that worked according to the design. It was concluded that the assembly of hardware was successful, and the control model is effective in governing the operations and stability of a three-phase inverter. This end-product will serve as the base model for future site implementations