Developing a real time load frequency control for power systems in a real time digital simulator

Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sh...

Full description

Saved in:
Bibliographic Details
Main Author: Tan, Shi Jie
Other Authors: Foo Yi Shyh Eddy
Format: Final Year Project
Language:English
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/10356/75093
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-75093
record_format dspace
spelling sg-ntu-dr.10356-750932023-07-07T15:41:31Z Developing a real time load frequency control for power systems in a real time digital simulator Tan, Shi Jie Foo Yi Shyh Eddy School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Electric power Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sharply. This results in a system collapse where there is a loss of electricity supply to the consumers. Under Frequency Load Shedding (UFLS) is one of the techniques employed by system operators to handle this contingency. In UFLS, a certain amount of electrical load is shed to correct the frequency deviation. However, to develop, test and implement the UFLS scheme on a power system, extensive hours and intensive resources are required. Additional costs and time may be required to revalidate the controllers if errors are not rectified during the development phase. Therefore, to speed up the development and testing process, researchers can leverage on real-time simulation technology. In this project, an UFLS scheme was developed and tested on an IEEE 9-bus network on a real-time digital simulator (manufactured by OPAL-RT). Results from the developed UFLS scheme showed the efficacy of the algorithm and demonstrated the benefits of using the powerful computational capabilities of real-time digital simulators in power system stability studies. Bachelor of Engineering 2018-05-28T05:09:53Z 2018-05-28T05:09:53Z 2018 Final Year Project (FYP) http://hdl.handle.net/10356/75093 en Nanyang Technological University 70 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Electrical and electronic engineering::Electric power
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Electric power
Tan, Shi Jie
Developing a real time load frequency control for power systems in a real time digital simulator
description Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sharply. This results in a system collapse where there is a loss of electricity supply to the consumers. Under Frequency Load Shedding (UFLS) is one of the techniques employed by system operators to handle this contingency. In UFLS, a certain amount of electrical load is shed to correct the frequency deviation. However, to develop, test and implement the UFLS scheme on a power system, extensive hours and intensive resources are required. Additional costs and time may be required to revalidate the controllers if errors are not rectified during the development phase. Therefore, to speed up the development and testing process, researchers can leverage on real-time simulation technology. In this project, an UFLS scheme was developed and tested on an IEEE 9-bus network on a real-time digital simulator (manufactured by OPAL-RT). Results from the developed UFLS scheme showed the efficacy of the algorithm and demonstrated the benefits of using the powerful computational capabilities of real-time digital simulators in power system stability studies.
author2 Foo Yi Shyh Eddy
author_facet Foo Yi Shyh Eddy
Tan, Shi Jie
format Final Year Project
author Tan, Shi Jie
author_sort Tan, Shi Jie
title Developing a real time load frequency control for power systems in a real time digital simulator
title_short Developing a real time load frequency control for power systems in a real time digital simulator
title_full Developing a real time load frequency control for power systems in a real time digital simulator
title_fullStr Developing a real time load frequency control for power systems in a real time digital simulator
title_full_unstemmed Developing a real time load frequency control for power systems in a real time digital simulator
title_sort developing a real time load frequency control for power systems in a real time digital simulator
publishDate 2018
url http://hdl.handle.net/10356/75093
_version_ 1772829176370298880