Developing a real time load frequency control for power systems in a real time digital simulator
Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sh...
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | Final Year Project |
Language: | English |
Published: |
2018
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/75093 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Language: | English |
id |
sg-ntu-dr.10356-75093 |
---|---|
record_format |
dspace |
spelling |
sg-ntu-dr.10356-750932023-07-07T15:41:31Z Developing a real time load frequency control for power systems in a real time digital simulator Tan, Shi Jie Foo Yi Shyh Eddy School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Electric power Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sharply. This results in a system collapse where there is a loss of electricity supply to the consumers. Under Frequency Load Shedding (UFLS) is one of the techniques employed by system operators to handle this contingency. In UFLS, a certain amount of electrical load is shed to correct the frequency deviation. However, to develop, test and implement the UFLS scheme on a power system, extensive hours and intensive resources are required. Additional costs and time may be required to revalidate the controllers if errors are not rectified during the development phase. Therefore, to speed up the development and testing process, researchers can leverage on real-time simulation technology. In this project, an UFLS scheme was developed and tested on an IEEE 9-bus network on a real-time digital simulator (manufactured by OPAL-RT). Results from the developed UFLS scheme showed the efficacy of the algorithm and demonstrated the benefits of using the powerful computational capabilities of real-time digital simulators in power system stability studies. Bachelor of Engineering 2018-05-28T05:09:53Z 2018-05-28T05:09:53Z 2018 Final Year Project (FYP) http://hdl.handle.net/10356/75093 en Nanyang Technological University 70 p. application/pdf |
institution |
Nanyang Technological University |
building |
NTU Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NTU Library |
collection |
DR-NTU |
language |
English |
topic |
DRNTU::Engineering::Electrical and electronic engineering::Electric power |
spellingShingle |
DRNTU::Engineering::Electrical and electronic engineering::Electric power Tan, Shi Jie Developing a real time load frequency control for power systems in a real time digital simulator |
description |
Maintaining the nominal system frequency is a critical aspect of ensuring stable power system operation in power system stability. During faults or other disturbances, there may be a mismatch between the generation and load in the system. This can cause the system frequency to deviate and decline sharply. This results in a system collapse where there is a loss of electricity supply to the consumers. Under Frequency Load Shedding (UFLS) is one of the techniques employed by system operators to handle this contingency. In UFLS, a certain amount of electrical load is shed to correct the frequency deviation. However, to develop, test and implement the UFLS scheme on a power system, extensive hours and intensive resources are required. Additional costs and time may be required to revalidate the controllers if errors are not rectified during the development phase. Therefore, to speed up the development and testing process, researchers can leverage on real-time simulation technology. In this project, an UFLS scheme was developed and tested on an IEEE 9-bus network on a real-time digital simulator (manufactured by OPAL-RT). Results from the developed UFLS scheme showed the efficacy of the algorithm and demonstrated the benefits of using the powerful computational capabilities of real-time digital simulators in power system stability studies. |
author2 |
Foo Yi Shyh Eddy |
author_facet |
Foo Yi Shyh Eddy Tan, Shi Jie |
format |
Final Year Project |
author |
Tan, Shi Jie |
author_sort |
Tan, Shi Jie |
title |
Developing a real time load frequency control for power systems in a real time digital simulator |
title_short |
Developing a real time load frequency control for power systems in a real time digital simulator |
title_full |
Developing a real time load frequency control for power systems in a real time digital simulator |
title_fullStr |
Developing a real time load frequency control for power systems in a real time digital simulator |
title_full_unstemmed |
Developing a real time load frequency control for power systems in a real time digital simulator |
title_sort |
developing a real time load frequency control for power systems in a real time digital simulator |
publishDate |
2018 |
url |
http://hdl.handle.net/10356/75093 |
_version_ |
1772829176370298880 |