Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)

Despite the development of many future operational concepts such as that of TBO, ATCOs remains a very important factor in ensuring the safety and efficiency of air travels. Many research have been done to improve data visualization to increase ATCOs performance, allowing them to have better performa...

Full description

Saved in:
Bibliographic Details
Main Author: Chew, Wei Xiang
Other Authors: Olga Sourina
Format: Final Year Project
Language:English
Published: 2018
Subjects:
Online Access:http://hdl.handle.net/10356/75763
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
id sg-ntu-dr.10356-75763
record_format dspace
spelling sg-ntu-dr.10356-757632023-03-04T18:53:40Z Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO) Chew, Wei Xiang Olga Sourina Chen Chun-Hsien School of Mechanical and Aerospace Engineering DRNTU::Engineering::Aeronautical engineering::Air navigation DRNTU::Engineering::Aeronautical engineering::Aircraft DRNTU::Engineering::Aeronautical engineering::Aviation DRNTU::Engineering::Aeronautical engineering::Electrical systems and equipment Despite the development of many future operational concepts such as that of TBO, ATCOs remains a very important factor in ensuring the safety and efficiency of air travels. Many research have been done to improve data visualization to increase ATCOs performance, allowing them to have better performance which indirectly increases airspace capacity without compromising safety. One of such visualization is the exploration of 3-dimensional visualization which was believed to be an essential skill that ATCOs will eventually develop in their course of work. In order to develop a future workstation for the ATCOs, Fraunhofer had developed a 3-D radar system to complement the existing 2-D radar. This was to provide an affordable methods to understand the potential of such application in ATCOs. As such, this project is part of many projects in determining the effects of this 3-D radar on the future operational concepts. The aims of this project is to test the effective of this 3-D radar on TBO through the ATCOs stress, emotions and trust in the system through the use of EEG as well as relevant questionnaires. By understand the effects, we would then be able to further improve certain functions and eventually implement into the operations of ATCOs. Bachelor of Engineering (Aerospace Engineering) 2018-06-13T09:27:44Z 2018-06-13T09:27:44Z 2018 Final Year Project (FYP) http://hdl.handle.net/10356/75763 en Nanyang Technological University 79 p. application/pdf
institution Nanyang Technological University
building NTU Library
continent Asia
country Singapore
Singapore
content_provider NTU Library
collection DR-NTU
language English
topic DRNTU::Engineering::Aeronautical engineering::Air navigation
DRNTU::Engineering::Aeronautical engineering::Aircraft
DRNTU::Engineering::Aeronautical engineering::Aviation
DRNTU::Engineering::Aeronautical engineering::Electrical systems and equipment
spellingShingle DRNTU::Engineering::Aeronautical engineering::Air navigation
DRNTU::Engineering::Aeronautical engineering::Aircraft
DRNTU::Engineering::Aeronautical engineering::Aviation
DRNTU::Engineering::Aeronautical engineering::Electrical systems and equipment
Chew, Wei Xiang
Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
description Despite the development of many future operational concepts such as that of TBO, ATCOs remains a very important factor in ensuring the safety and efficiency of air travels. Many research have been done to improve data visualization to increase ATCOs performance, allowing them to have better performance which indirectly increases airspace capacity without compromising safety. One of such visualization is the exploration of 3-dimensional visualization which was believed to be an essential skill that ATCOs will eventually develop in their course of work. In order to develop a future workstation for the ATCOs, Fraunhofer had developed a 3-D radar system to complement the existing 2-D radar. This was to provide an affordable methods to understand the potential of such application in ATCOs. As such, this project is part of many projects in determining the effects of this 3-D radar on the future operational concepts. The aims of this project is to test the effective of this 3-D radar on TBO through the ATCOs stress, emotions and trust in the system through the use of EEG as well as relevant questionnaires. By understand the effects, we would then be able to further improve certain functions and eventually implement into the operations of ATCOs.
author2 Olga Sourina
author_facet Olga Sourina
Chew, Wei Xiang
format Final Year Project
author Chew, Wei Xiang
author_sort Chew, Wei Xiang
title Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
title_short Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
title_full Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
title_fullStr Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
title_full_unstemmed Emotion, stress, and trust in the ATC system during Trajectory Based Operations (TBO)
title_sort emotion, stress, and trust in the atc system during trajectory based operations (tbo)
publishDate 2018
url http://hdl.handle.net/10356/75763
_version_ 1759852955022917632