Report on industrial attachment with L & M Concrete Specialists
A three-month training period in the design office which included projects in design and analysis of both reinforced and prestressed concrete was followed by 3 months of on-site training at Insead, a French University and an Ardmore Park condominium.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/8024 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Summary: | A three-month training period in the design office which included projects in design and analysis of both reinforced and prestressed concrete was followed by 3 months of on-site training at Insead, a French University and an Ardmore Park condominium. |
---|