Report on industrial attachment with IBM System Storage Division
First project is to set up a procedure to improve the failure follow up system. Second project is to review the data entry system in OQA. Third project is to develop a Lotus Notes agent.
Saved in:
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/8066 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Nanyang Technological University |
Summary: | First project is to set up a procedure to improve the failure follow up system. Second project is to review the data entry system in OQA. Third project is to develop a Lotus Notes agent. |
---|