Analytical and experimental studies of dragging hall anchors through rock berm

An analytical method is proposed in this paper to calculate the maximum embedded depth of a dragged Hall anchor when passing through rock berm and to thus define a minimum buried depth of pipelines in rock berm to prevent pipelines from being damaged by dragging anchors. The movement of a Hall ancho...

Full description

Saved in:
Bibliographic Details
Main Authors: Yan, Shuwang, Guo, Bingchuan, Sun, Liqiang, Guo, Wei, Lei, Zhenming
Other Authors: School of Civil and Environmental Engineering
Format: Article
Language:English
Published: 2015
Subjects:
Online Access:https://hdl.handle.net/10356/80832
http://hdl.handle.net/10220/38861
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Nanyang Technological University
Language: English
Description
Summary:An analytical method is proposed in this paper to calculate the maximum embedded depth of a dragged Hall anchor when passing through rock berm and to thus define a minimum buried depth of pipelines in rock berm to prevent pipelines from being damaged by dragging anchors. The movement of a Hall anchor in rock berm is interpreted based on the equilibrium conditions for resisting and driving moments acting on the anchor. To verify the accuracy of the proposed analytical method, model tests were carried out by using three scaled Hall anchor models and dragging them through rock berm. The comparisons between the two studies show that the average value of their differences for the stable embedded depth of a Hall anchor in sand and in rock berm are only 1.7% and 2.7%, respectively. The good agreements indicate that the proposed method is accurate enough to calculate the minimum buried depth of pipeline in rock berm during pipeline design.